Contractors Corner

Construction Site Stormwater Runoff Control

Uncontrolled stormwater runoff from construction sites can significantly impact rivers, lakes, and estuaries. Sediment in waterbodies from construction sites can reduce the amount of sunlight reaching aquatic plants, clog fish gills, smother aquatic habitat and spawning areas, and impede navigation.

Phase II municipal separate storm sewer systems (MS4s) are required to develop a program to reduce pollutants in stormwater runoff to the MS4 for construction sites disturbing one or more acres. This primarily includes developing:

  • An Ordinance,
  • Requirements to implement erosion and sediment control best management practices (BMPs),
  • Requirements to control other waste at the construction site,
  • Procedures for reviewing construction site plans,
  • Procedures to receive and consider information submitted by the public, and
  • Procedures for inspections and enforcement of stormwater requirements at construction sites.

In addition to the stormwater requirements that Phase II MS4s place on construction sites, construction operators may also need to apply for NPDES permit coverage, generally if their project disturbs more than 1 acre and discharges to a waterbody...

Read more about stormwater runoff.


Post-Construction Stormwater Management in New Development and Redevelopment

As areas are developed, the amount of paved surfaces increase leading to an increase in stormwater volume and pollutants, which can harm lakes, rivers, streams, and coastal areas.

The best way to mitigate stormwater impacts from new development is to use practices that treat, store, and infiltrate runoff onsite before it can affect water bodies downstream. Innovative site designs that reduce paved surfaces, or imperviousness, and other green infrastructure practices are excellent ways to reduce flows and improve water quality.

Phase II MS4s are required to address post-construction stormwater runoff from new development and redevelopments that disturb one or more acres. This primarily includes developing:

  • strategies to implement a combination of structural and non-structural BMPs,
  • an ordinance to address post-construction runoff, and
  • a program to ensure adequate long-term operation and maintenance of BMPs.

Read more about post-construction stormwater management.