Page not found
Search results
-
Right-Of-Way (ROW) Rules
Engineering / Public Works | PageOrdinance was adopted by the City Council on January 11th, 2005 and it provides you with necessary ... compaction is attained.- Timing of repairs o Within 14 days of the repair work/installation, contractor shall ... days of the repair/installation, the City shall initiate the repair and deduct all costs from the ...
-
Asphalt Art Guide
Arts & Culture Commission | PageLife, was installed in March 2017 by over 100 volunteers in two days. In 2019, the same partners came ... 31). Mural by Jessie and Katey. Photo by Steve Weinik. © bloomberg Philanthropies Support LLC 2019. all ... Indefinite, maintained every 1–3 years MaTERIaLS Latex traffic marking paint COST Materials: $1,000 Design ...
-
Concrete Slabs
Community Development | PagePorches, carport slabs, and steps exposed to the weather, and garage floor slabs 3,500 c, d a At 28 days ... aggregate ¾ inch and larger 4 8 10 12 5 10 13 15 6 12 15 18 HOT AND COLD WEATHER ISSUES Hot Weather Hot ... To avoid this problem, pouring of concrete should be planned to avoid warm days if possible. Proper ...
-
Fasteners
Community Development | PageGYPSUM BOARD Table R702.3.5 Thickness of Gypsum Board Size of Fasteners to Wood Framing 3/8” Nails: 13 ... a minimum of 5/8 inch. 1/2 “ Nails: 13 gage, 1 3/8” long, 19/64” head; 0.098 diameter, 1 ¼” long, annular- ... 5/8 inch. 5/8” Nails: 13 gage, 1 5/8” long, 19/64” head; 0.098 diameter, 1 3/8” long, annular- ringed; ...
-
2023 Electric Vehicle Service Rate Schedule
Public Utilities | Page12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ... Effective 05/01/2021 I\...l--"--...l-i ""l /-i O /"'11"\-i I"\ ...
-
Structural Engineers Reports
Administration | Pageattend a meeting to present this information on 11-8-2017 (and be available for questions). The original ... (2/13/2017) regarding the installation of a new air duct supported from the roof structure. A limited ... principals. Results of Analysis: 1. The Roof purlins (3 ½ x 13 D.F.) have a design snow load capacity of ...
-
Water Quality Reports
Public Utilities | Pageplumbing. Copper (08/11/21) 0 ppm 90% of homes less than 1.3 ppm 1.33 ppm 3 out of 20 YES Corrosion of ... plumbing. Copper (11/14/18) 0 ppm 90% of homes less than 1.3 ppm 1.04 ppm 1 out of 20 NO Corrosion of ... Water Quality Report: 2021 Water Quality Report: 2020 Water Quality Report: 2019 Water Quality Report: ...
-
Right-Of-Way (ROW) Maintenance
Engineering / Public Works | Pageproper height (normally 41-inch minimum to 45-inch maximum) 4. An installation that will pivot or rotate ... will be notified in writing that the owner must replace it within 60 days. As an incentive to use ... unlawful support remaining after the expiration of the 60-day period will be removed and replaced by the ...
-
Footings, Foundations & Slabs
Community Development | Pagegarage floor slabs 3,500c,d a. At 28 days psi. b. Concrete in these locations that may be subject to ... during the first 28 days. Strength of concrete also increases as the water-cement ratios decrease. While ... Mixtures Are Not Available Specified 28-day compressive strength, f’c psi Water-cement ratio by weight ...
-
Waste Management Service Calendar 2021
Engineering / Public Works | Pageidentified on the left side of the calendar. Recycling and garbage will be picked up on the same day. 511 HWY ... E O E O E O O E O E O O E O E O O E O E O O E O E O E E O E O E E O E O E O E O E O O E O E O O E O E O E E O E O E E O E O E Holiday Schedule for 2021 WM staff work all holidays except Memorial Day, July 4th, Labor Day ... , Thanksgiving, Christmas Day, and New Year’s Day. If the holiday falls on or before your pickup day, your service ...