Page not found

Search results

  1. Dedicate a Bench

    Engineering / Public Works | News/Press Release | Feb 24, 2022

    x 12” (4 LINES) (61 Charaters per Line – Includes spaces – Includes Upper & Lower case) Line 1: Line ...

  2. Dedicate a Bench

    Engineering / Public Works | Page

    x 12” (4 LINES) (61 Charaters per Line – Includes spaces – Includes Upper & Lower case) Line 1: Line ...

  3. Water Treatment & Distribution

    Public Utilities | Page

    consisting mostly of 6”, 8”, and 12” pipes. The GRPUC is responsible for the construction, operation, and ...

  4. Utility Information

    Engineering / Public Works | Page

    Commercial $48.98 per acre per month. Industrial $48.98 per acre per month. Institutional $43.44 per acre per month. ...

  5. Water Quality Reports

    Public Utilities | Page

    Water Quality Report: 2021 Water Quality Report: 2020 Water Quality Report: 2019 Water Quality Report: ... Lead (08/11/21) 0 ppb 90% of homes less than 15 ppb 2.9 ppb 0 out of 20 NO Corrosion of household ... plumbing. Copper (08/11/21) 0 ppm 90% of homes less than 1.3 ppm 1.33 ppm 3 out of 20 YES Corrosion of ...

  6. Dale Christy

    Directory Listing

    licensure as a K-12 Principal and School District Superintendent.  Dale and wife Misty have been married for ...

  7. Electric Distribution

    Public Utilities | Page

    September 1, 2015. In addition, beginning in 2019, the generation capacity charge for each year is based on ...

  8. Public Information Requests

    Administration | Page

    there is a charge of $0.25 per single-sided 8 ½" x 11" page in addition to shipping/mailing ... Private MS §13.02, subd. 12 Private MS §13.10, subd. 1B Nonpublic MS §13.02, subd. 9 Available only to the ... file □ Other: 11 Approved by the City Council on xx/xx/03 Notice to Persons Under Age 18 Exhibit C Some ...

  9. Engineering/Public Works

    Engineering / Public Works | Page

    x 12” (4 LINES) (61 Charaters per Line – Includes spaces – Includes Upper & Lower case) Line 1: Line ...

  10. Sheds

    Community Development | Page

    at 326-7601 CONSTRUCTION  A concrete slab is not required.  Maximum height is 12 foot measured from ...

Pages