Page not found
Search results
-
How Do I Obtain A Building Permit
Community Development | Pageincluded where applicable): Attached 12X12 Deck $132.50 flat rate Basement remodeling ($10,000 valuation) ... $307.94 Reroof house ($7500 valuation) $61.00 flat rate Garage ($10,000 valuation) $307.94 Dwelling ... take to get a permit? Permits for work that requires no review are issued the same day and generally at ...
-
Police Reserves
Police | Pageyear, providing security at the yearly Tall Timber Days, Car show and Swap, Itasca County Fair, National ... also provide traffic control for the Timber Man Triathlon and several 5K and 10K runs a year. They ...
-
Grand Rapids / Itasca County Airport
Engineering / Public Works | Pagesales- 100LL and Jet A Flight training Two 10 unit T-hangar Heated hangar space Additional Facilities The ... three multi-engine and one jet} Master Plan completed in 2018 has based aircraft growing to 92 over the ... at least 500 operations each year 4 T-hangar buildings (one 16-unit, two 10-units, and one 8-unit), ...
-
Water Quality Reports
Public Utilities | Page2018 Water Quality Report: 2017 Water Quality Report: 2016 Water Quality Report: 2015 Water Quality ... Result Range of Detected Test Results Violation Typical Sources Nitrate 10 ppm 10.4 ppm 0.34 ppm N/A NO ... Conservation is essential, even in the land of 10,000 lakes. For example, in parts of the metropolitan area, ...
-
Stormwater Credits Policy
Engineering / Public Works | PageUtility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... 90 days of approval. No retroactive credits will be approved or applied to billings. Per section ... stormwater utility charges. Only those properties that can demonstrate the capacity to handle a 10-year or ...
-
Radon
Community Development | Pagesieve and be retained by a 1/4-inch sieve or b) A layer of sand overlain by a layer or strips of ... least 12 inches above the roof at least 10 feet from any window or other opening into conditioned spaces ... that is less than 2 feet below the exhaust point and at least 10 feet from any window or opening into ...
-
Utility Information
Engineering / Public Works | Pagesection 1.0 through 1.6) to finance the City’s Stormwater Management Program. In addition, the Utility ... year. If the credit is approved, the credit will be applied within 90 days of approval. No retroactive ... can demonstrate the capacity to handle a 10-year or 100-year rain event can receive a stormwater ...
-
Garages: One Story
Community Development | Page12” o.c. Hem Fir 6’1” 9’6” 12’2” 14’10” SPF 6’6” 10’2” 13’2” 15’9” 16” o.c. Hem Fir 5’6” 8’4” 10 ... Span Header Size # Jack Studs Span Heade r Size # Jack Studs 2-10 2-2X4 1 2-6 2-2X4 1 2-3 2-2X6 1 4-2 ... 2-2X6 1 3-8 2-2X6 1 3-3 2-2X6 1 5-4 2-2X8 2 5-7 2-2X10 2 5-0 2-2X10 2 6-6 2-2X10 2 6-6 2-2X12 2 5-10 ...
-
Building Plans
Community Development | Pageetc.- 4- EXISTING DWELLING 16’ 6” 13’ PIN NEW FOOTING TO EXISTING CENTER PAD 24” X 24” 10” DEEP 8” x 20” ... Double Top Plate Manufactured Wood Trusses 24” o.c. 10 Inch by ½ Inch Anchor Bolts 6 Ft o.c., 12 inches ... ¾ Inch T&G Plywood over 2X10 Floor Joists, #2 Hem-Fir – 16” o.c. 2X6 Bottom Plate 2X6 Studs, 16” o.c. ...
-
Security Lights
Public Utilities | Pagecustomer according to the Security Lighting Rate Schedule, Policy Reference T.10.b GRPUC will install the ... automatically renewable for twelve month periods, unless cancelled by 30 days written notice by either party to ... Reference T.10.b Adjustments: Plus the applicable proportionate part of any taxes and assessments imposed by ...