Page not found

Search results

  1. Garages: One Story

    Community Development | Page

    12’10” SPF 5’8” 8’5” 10’8” 13’1” 24” o.c. Hem Fir 4’8” 6’9” 8’7” 10’6” SPF 4’8” 6’11” 8’9” 10’8” ... (at least 1/8” = 1 ft. min.). They may be on 8 ½ X 11 paper. Plans must include a site plan, floor ... slab Reinforcement must be supported in center to upper 1/3rd of slab Asphalt shingles with D225 Type ...

  2. Grand Rapids Sculpture RFQ

    Arts & Culture Commission | Bid/RFP

    American (3.1%), Latino (1.2%), Black (1.1%), and Asian (.9%) racial and ethnic minorities (U.S. Census ... approximately seven weeks to prepare preliminary concepts, including the presentations to the Arts and Culture ... 3 finalists  April 13, 2020 – City Council approves contracts with selected artists/teams for preliminary ...

  3. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... 12 $5.71 $3.99 $72.51 0 48 49 96 97 360 over 360 13 $5.71 $3.99 $78.22 0 52 53 104 105 390 over 390 ...

  4. Consumption & Display Application Packet

    Administration | Page

    Address_10: Name_11: Address_11: Name_12: Address_12: Name_13: Address_13: 2 Renewal: B State whether dancing ... WC5: WC6: WC7: WC8: WC9: WC10: WC11: WC12: WC13: WC16: WC14: WC15: WC18: WC17: WC19: WC20: WC21: WC22: ... located:________________________________________________________________________________ (Name) (Address) 11. Has applicant; if partnership, and partner; if corporation, any officer or ...

  5. Basic Wood Framing

    Community Development | Page

    (JACK STUDS) One floor only 2-2X4 3-1 (1) 2-11 (1) 2-8 (1) 2-7 (1) 2-2X6 4-6 (1) 4-3 (1) 3-11 (1) 3-9 ... (2) 7-0 (2) 6-7 (2) 3-2X8 7-2 (1) 6-9 (1) 6-3 (1) 5-11 (2) 3-2X10 8-9 (1) 8-2 (1) 7-7 (2) 7-2 (2) ... 9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ...

  6. 2023 City Water Rates

    Public Utilities | Page

    2" 3" 4" 6" Commodity Charges Rate $9.90 $13.80 $15.85 $17.76 $28.70 $108.70 $138.27 ... $11.01 $3.94 $4.87 $6.22 $3.76 $4.64 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: ...

  7. Data Request

    Police | Page

    stat. Sec. 13.03, Subd. 2 and 13.05, Subd. 5 and 8. The Minnesota Data Practices Act establishes ... Data not on Individuals Meaning of Classification Public MS §13.02, subd. 15 Public MS §13.02, subd. 15 ... Public MS §13.02, subd. 4 Available to anyone for any reason Private MS §13.02, subd. 12 Private MS ...

  8. Fasteners

    Community Development | Page

    GYPSUM BOARD Table R702.3.5 Thickness of Gypsum Board Size of Fasteners to Wood Framing 3/8” Nails: 13 ... a minimum of 5/8 inch. 1/2 “ Nails: 13 gage, 1 3/8” long, 19/64” head; 0.098 diameter, 1 ¼” long, annular- ... 5/8 inch. 5/8” Nails: 13 gage, 1 5/8” long, 19/64” head; 0.098 diameter, 1 3/8” long, annular- ringed; ...

  9. Structural Engineers Reports

    Administration | Page

    attend a meeting to present this information on 11-8-2017 (and be available for questions). The original ... (2/13/2017) regarding the installation of a new air duct supported from the roof structure. A limited ... principals. Results of Analysis: 1. The Roof purlins (3 ½ x 13 D.F.) have a design snow load capacity of ...

  10. 2023 Adopted Levy and Tax Rate

    Finance | Page

    $11,129,938 Net amount levied to property owners $7,975,967 TAX TAXABLE NET CITY CEMETERY TOTAL YEAR TAX ... 7,014,456 4,874,006 67.019 2.466 69.485 2013 7,346,013 5,068,674 66.644 2.355 68.999 2014 7,014,208 ... 8,851,302 7,386,756 81.050 2.404 83.454 2022 9,421,233 7,777,491 80.234 2.318 82.553 2023 11 ...

Pages