Page not found
Search results
-
2023 Electric Vehicle Service Rate Schedule
Public Utilities | Page2023 Electric Vehicle Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact Info Block ... kWh/mo@ $0.1612/kWh All kWh/mo @ $0.0550/kWh standalone charqe 12/14/2022 01/01/2023 Minimum Bill Customer ... Charge Customer Charge On Peak Hours: 8:00 a.m. to 10:00 p.m. Monday- Friday PURCHASED POWER ADJUSTMENT ...
-
Water Quality Reports
Public Utilities | PageWater Quality Report: 2021 Water Quality Report: 2020 Water Quality Report: 2019 Water Quality Report: ... Result Range of Detected Test Results Violation Typical Sources Nitrate 10 ppm 10.4 ppm 0.34 ppm N/A NO ... Conservation is essential, even in the land of 10,000 lakes. For example, in parts of the metropolitan area, ...
-
Site Plans
Community Development | PageDraw the site plan to the most appropriate scale, for example, 1" = 10’, 1" = 20’, 1/4 ... 30 Ft Lot Lines 60 Ft Street Right of Way Scale 1” = 10’ Existing Dwelling 38 Ft Wide X 20 Ft Deep ... Exst. 12X12 Shed Proposed New 12X24 Ft Garage Driveway Scale 1” = 10’ Proposed New Garage Existing ...
-
Permit Fee Calculator
Community Development | PageReview Fee State Surcharge Total Fee $630,000.00 $3,890.10 $2,528.57 $315.00 $6,733.66 State did plan ... review 25% plan review fee: $632.14 $4,837.24 $1,000,001.00- $2,000,000.00 Project Cost Permit Fee Plan ... Cost Permit Fee Plan Review Fee State Surcharge Total Fee $6,000,000.00 $21,564.85 $14,017.15 $1,550.00 ...
-
How Do I Obtain A Building Permit
Community Development | Pageincluded where applicable): Attached 12X12 Deck $132.50 flat rate Basement remodeling ($10,000 valuation) ... $307.94 Reroof house ($7500 valuation) $61.00 flat rate Garage ($10,000 valuation) $307.94 Dwelling ... take to get a permit? Permits for work that requires no review are issued the same day and generally at ...
-
Police Reserves
Police | Pageyear, providing security at the yearly Tall Timber Days, Car show and Swap, Itasca County Fair, National ... also provide traffic control for the Timber Man Triathlon and several 5K and 10K runs a year. They ...
-
Stormwater Credits Policy
Engineering / Public Works | PageUtility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... 90 days of approval. No retroactive credits will be approved or applied to billings. Per section ... stormwater utility charges. Only those properties that can demonstrate the capacity to handle a 10-year or ...
-
Radon
Community Development | Pagesieve and be retained by a 1/4-inch sieve or b) A layer of sand overlain by a layer or strips of ... least 12 inches above the roof at least 10 feet from any window or other opening into conditioned spaces ... that is less than 2 feet below the exhaust point and at least 10 feet from any window or opening into ...
-
Asphalt Art Guide
Arts & Culture Commission | Pagerights reserved. 3 ABOUT THE GUIDE 9 CASE STUDIES 12 art in the Roadway 34 art in Pedestrian Space 48 art ... Italy (Case study on page 45) Photo by bloomberg Philanthropies C a S E S T U D IE S CASE STUDIES 10 ... Dragonfly mural in 2014, 2015, 2016, and 2019. Photo by Lisa Cach Green Lake Dragonfly 14 ...
-
Building Plans
Community Development | Pageetc.- 4- EXISTING DWELLING 16’ 6” 13’ PIN NEW FOOTING TO EXISTING CENTER PAD 24” X 24” 10” DEEP 8” x 20” ... Double Top Plate Manufactured Wood Trusses 24” o.c. 10 Inch by ½ Inch Anchor Bolts 6 Ft o.c., 12 inches ... ¾ Inch T&G Plywood over 2X10 Floor Joists, #2 Hem-Fir – 16” o.c. 2X6 Bottom Plate 2X6 Studs, 16” o.c. ...