Page not found

Search results

  1. Water Treatment & Distribution

    Public Utilities | Page

    treating 3.24 million gallons of water per day. Water treatment consists of aeration, gravity filtration, ...

  2. Radon

    Community Development | Page

    24 inches in diameter and 36 inches high must be provided. 16) Identification. Each vent pipe must be ... LOCATION REQUIRED SUMPS PASSIVE SYSTEM (Minimum Required) ACTIVE SYSTEM 24” 36” 1. Gasketed and sealed ... cover 2. Interior drain tile loop 3. Radon vent to sump 1. Electrical circuit in approved box 2. 24 ...

  3. Administration

    Administration | Page

    City Clerk. The Administration Department: Prepares agendas and provides support information for 24 ...

  4. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    Maintenance Five Year Plan Summary 24‐25 City Hall RTU #3 26 City Hall RTU #1 27 ... 106 CP 2019‐2, GR/Cohasset Connection Trail Phase 2 107 Year Project Starts: 2024 ... improvements described in the capital improvement plan. 1.02. Before the approval of the capital improvement ...

  5. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 04/26/18 04:00pm

    Energy Resources $ 241. 02 Northern Star Cooperative Service $ 318.80 P.U.0 $ 254.02 SEH-RCM $ 2,396.25 ...

  6. Test Proctoring

    Grand Rapids Area Library | Page

    staff at least 24 hours in advance. Coordinate delivery/receipt of exam materials with school/library. ...

  7. 2023 City Electric Interim Annexation Areas Service Rate Schedule

    Public Utilities | Page

    12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ...

  8. Stormwater

    Engineering / Public Works | Page

    Utility Ordinance #04-08-10  (Ordinance Chapter 24 Section 1.0-1.6). This ordinance was originally ...

  9. Electric Distribution

    Public Utilities | Page

    September 1, 2015. In addition, beginning in 2019, the generation capacity charge for each year is based on ...

  10. Site Plans

    Community Development | Page

    Exst. 12X12 Shed Proposed New 12X24 Ft Garage Driveway Scale 1” = 10’ Proposed New Garage Existing ...

Pages