Page not found

Search results

  1. 2023 Electric Security Light Rates

    Public Utilities | Page

    Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ...

  3. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28.00 ... All kWh/mo@ $0.1111/kWh All kWh/mo @ $0.0557/kWh Demand: All kW@ $17.64/kW 12/14/2022 01/01 ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... first year of the new contract, GRPUC set the PPAC adjustment at $0.01583/kWh. For future years in the ... Rates- 3- formula. Table 2-1 lists the PPAC rates for each year as included in the projections. The new ...

  5. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

     Funding Source Summary 9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... 281,750$ 296,356$ 315,671$ CITY OF GRAND RAPIDS LEVY COMPARISONS FOR YEARS 2020- 2025 Based on 2021-2025 ... 1 City Council Resolution Adopting the 2021 ‐ 2025 2‐3 City of Grand Rapids Amended Capital Improvement Plan Five Year ...

  6. Administration

    Public Utilities | Page

    over a five to seven-year period. Budget-to-actual comparisons are made on a quarterly basis, with ... needed. In 2020, David Berg Consulting conducted an electric cost of service and rate design study to ... a five-year financial plan and financial performance indicators. In 1997, the GRPUC entered into ...

  7. City Council Regular Meeting

    City Council | Calendar Event | 05/14/12 04:00pm

    6,444,608 40,167,796 Wednesdav, May 09, 10/1 C/TY OF GRAND RAP/DS LEW COMPAR/SONS FOR YEARS 2011- 2016 Based ... Regular Meeting Sort A to Z citycouncil_closed_2012-05-14.pdf 01"./2(13 0"%#, ... Administrator CITYOF GRAND RAPIDS Page 1 Printed on 5H1/2012 C I TY O F G RAN D RAP I DS C40 NORTH AVE. GttANU ...

  8. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... (ACFR) for the fiscal year ended December 31, 2020. This was the twenty-ninth consecutive year that the ... Report For the Fiscal Year Ended December 31, 2020 Executive Director/CEO 9- This page intentionally left ...

  9. 2023 Load Management Electric Service Rate Schedule

    Public Utilities | Page

    8.40 8.40 8.40 (9.83) (9.83) (19.73) Adopted: Effective: Billed After: Energy Charge Monthly Credit ... Monthly Credit 12/14/2022 01/01/2023 01/01/2023 All kWh/mo @ $0.0699/kWh Minimum bill- Customer Charge All ... Adopted 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted ...

  10. Grand Rapids Monitoring Results

    Public Utilities | Page

    This report contains our monitoring results from January 1 to December 31, 2020. We work with the ... Water Quality Data Tables The tables below show the contaminants we found last year or the most recent ... tables. We sample for some contaminants less than once a year because their levels in water are not ...

Pages