Page not found
Search results
-
Administration
Public Utilities | Pageover a five to seven-year period. Budget-to-actual comparisons are made on a quarterly basis, with ... needed. In 2020, David Berg Consulting conducted an electric cost of service and rate design study to ... a five-year financial plan and financial performance indicators. In 1997, the GRPUC entered into ...
-
Public Utilities Financial Reports
Public Utilities | Page2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ...
-
Data Request
Police | Pageon xx/xx/03 City of Grand Rapids Data Access Procedures Introduction These procedures are adopted to ... stat. Sec. 13.03, Subd. 2 and 13.05, Subd. 5 and 8. The Minnesota Data Practices Act establishes ... problems in obtaining access to data may be directed. 2 Approved by the City Council on xx/xx/03 Categories ...
-
Community Development Fee Schedule
Community Development | PageSigns requiring structural review. (3- 27-06) $57.88 $37.62 $1.00 $96.50 Detached Steps/Deck over 30” ... $79.70 $113.03 $26.20 $51.80 $73.47 $1.00 $1.00 $1.00 $67.50 $132.50 $186.50 Fence over 6 feet in height ... (3-27-06) $57.88 $37.62 $1.00 $96.50 Retaining Wall Over 4 feet in height (3-27-06) $57.88 $37.62 $1.00 ...
-
Financial Reports
Finance | Page2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... (ACFR) for the fiscal year ended December 31, 2020. This was the twenty-ninth consecutive year that the ... Report For the Fiscal Year Ended December 31, 2020 Executive Director/CEO 9- This page intentionally left ...
-
2022 Cost of Service Studies
Public Utilities | Pageexamination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... first year of the new contract, GRPUC set the PPAC adjustment at $0.01583/kWh. For future years in the ... Rates- 3- formula. Table 2-1 lists the PPAC rates for each year as included in the projections. The new ...
-
2021-2025 Amended Capital Improvement Plan
Finance | PageFunding Source Summary 9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... 281,750$ 296,356$ 315,671$ CITY OF GRAND RAPIDS LEVY COMPARISONS FOR YEARS 2020- 2025 Based on 2021-2025 ... 1 City Council Resolution Adopting the 2021 ‐ 2025 2‐3 City of Grand Rapids Amended Capital Improvement Plan Five Year ...
-
2023 City Multi-Family Water Rate Schedule
Public Utilities | Page150 over 150 6 $5.71 $3.99 $38.25 0 24 25 48 49 180 over 180 7 $5.71 $3.99 $43.96 0 28 29 56 57 210 ... 14 $5.71 $3.99 $83.93 0 56 57 112 113 420 over 420 15 $5.71 $3.99 $89.64 0 60 61 120 121 450 over 450 ... over 690 24 $5.71 $3.99 $141.03 0 96 97 192 193 720 over 720 25 $5.71 $3.99 $146.74 0 100 101 200 201 ...
-
City Council Regular Meeting
City Council | Calendar Event | 06/25/12 04:00pmMayor and City Administrator to sign the School Liaison Officer Agreement for the 2012-2013 school year ... a five (5) year contract for Refuse and Recycling Collection Services commencing August 1st, 2012. ... 12-57 by consent roll call 15. Appointment of Michael Liebel to the position of 2nd Assistant Fire Chief ...
-
City Council Regular Meeting
City Council | Calendar Event | 07/13/15 04:00pmcitycouncil_agenda_2015-07-13.pdf Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings City Council ... Regular Meeting Sort A to Z citycouncil_closed_2015-07-13.pdf 01"./2(13 455 ... 5"8%7"&8''" H5:5#9"8" G57"455 6"#9" H5" 8%7".8I 7G" ...