Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ...

  2. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... (ACFR) for the fiscal year ended December 31, 2020. This was the twenty-ninth consecutive year that the ... Report For the Fiscal Year Ended December 31, 2020 Executive Director/CEO 9- This page intentionally left ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... first year of the new contract, GRPUC set the PPAC adjustment at $0.01583/kWh. For future years in the ...

  4. Data Request

    Police | Page

    $100.00 Temporary on-sale $25.00 Rollerskating License $200.00 per year or fraction thereof Brewer ... Merchant (Resolution No. 06-110) $150.00 per year Permit to keep Chickens $20.00 per year CENTRAL SCHOOL ... animal violations $25.00 Registration of a Dangerous Dog (Res. 06-61) $500.00 Fireworks: Illegal Use, ...

  5. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

     Funding Source Summary 9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... Maintenance Five Year Plan Summary 24‐25 City Hall RTU #3 26 City Hall RTU #1 27 ... 281,750$ 296,356$ 315,671$ CITY OF GRAND RAPIDS LEVY COMPARISONS FOR YEARS 2020- 2025 Based on 2021-2025 ...

  6. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    citycouncil_agenda_2012-06-25.pdf Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings City Council ... Regular Meeting Sort A to Z citycouncil_worksession_2012-06-25_3.pdf CITY OF GRAND RAPIDS Meeting Agenda ... 1 Printed on 6/25/2012 powered by Legistar'^"citycouncil_agenda_2012-06-25.pdf CITY OF GRAND ...

  7. 2023 Adopted Levy and Tax Rate

    Finance | Page

    Levy 2020 Levy 2021 Levy 2022 Levy Payable 2019 Payable 2020 Payable 2021 Payable 2022 Payable 2023 ... 80,000 Levy Internal Loan-Equip Purchases 219,000 179,000 192,000 224,000 224,000 Abatement Levies 25 ... ,000 25,000 25,000 15,000 20,000 Special Levies----- Total Levy Required for Operations 6,019,239 6,098,764 ...

  8. Itasca Clean Energy Solar Plus Battery Storage Project

    Public Utilities | Page

    power in April 2022. • Anticipated 25-year lifespan. Battery Energy Storage System • 1 MW-2.5 hour ... facility includes a 2 Megawatt (MW) solar array paired with a 1 MW- 2.5 hour lithium ion battery surrounded ... with the community. The new facility includes a 2 Megawatt (MW) solar array paired with a 1 MW- 2.5 ...

  9. Community Development Fee Schedule

    Community Development | Page

    each additional $1,000.00 or fraction thereof, to and including $25,000.00 (3-27-06) $25,001.00 to ... (3-27-06) $15.15* each Comprehensive Plan Appendix (3-27-06) $25.25* each Zoning Letter $35.35* each Zoning ... thereof, to and including $2,000.00 $2,001.00- $25,000.00 $70.00 * for the first $2,000.00 plus $14.20* for ...

  10. Structural Engineers Reports

    Administration | Page

    documents include: a) Documentation and repair of a roof truss diagonal web member (3/25/2001). This ... 6 years until 2003 when the 2000 international building code (IBC) was adopted in Minnesota. Under the ... approximately 25 psf. 2. The 1962 Roof Trusses have a uniform snow load design capacity of approximately 20 psf. ...

Pages