Page not found

Search results

  1. Temporary 3.2 Beer Sales and Service

    Administration | Page

    Religious or other non-profit organizations in existence for at least three years temporary 3.2 beer license ... temporary license. City Ordinance 35.02(d)(e) I hereby apply for a temporary permit to dispense on-sale 3.2 ... Minnesota statute 340A.403, subd. 2, paragraph (a) allows cities to issue on-sale 3.2 malt liquor ...

  2. 2023 Electric Security Light Rates

    Public Utilities | Page

    01/01/2023 Last Revised: Adopted 12/15/2021 Adopted 02/17/2021 Effective 04/01/2022 Effective 02 ... /17/2021 Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ...

  3. Data Request

    Police | Page

    $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ... Data not on Individuals Meaning of Classification Public MS §13.02, subd. 15 Public MS §13.02, subd. 15 ... Public MS §13.02, subd. 4 Available to anyone for any reason Private MS §13.02, subd. 12 Private MS ...

  4. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ...

  5. Administration

    Public Utilities | Page

    over a five to seven-year period. Budget-to-actual comparisons are made on a quarterly basis, with ... needed. In 2020, David Berg Consulting conducted an electric cost of service and rate design study to ... a five-year financial plan and financial performance indicators. In 1997, the GRPUC entered into ...

  6. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... (ACFR) for the fiscal year ended December 31, 2020. This was the twenty-ninth consecutive year that the ... Report For the Fiscal Year Ended December 31, 2020 Executive Director/CEO 9- This page intentionally left ...

  7. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01 ... Effective/Billed After: 01-01-2023 Applicable within the corporate limits of the City of Grand Rapids: Customer ...

  8. 2022 Cost of Service Studies

    Public Utilities | Page

    Table 3-2 Cost of Service Results Comparison of Cost and Revenues 2021 Test Year Customer Classification ... examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... first year of the new contract, GRPUC set the PPAC adjustment at $0.01583/kWh. For future years in the ...

  9. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

     Funding Source Summary 9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... 281,750$ 296,356$ 315,671$ CITY OF GRAND RAPIDS LEVY COMPARISONS FOR YEARS 2020- 2025 Based on 2021-2025 ... 1 City Council Resolution Adopting the 2021 ‐ 2025 2‐3 City of Grand Rapids Amended Capital Improvement Plan Five Year ...

  10. 2023 City Water Rates

    Public Utilities | Page

    Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... Effective/Billed After: 01-01-2023 Applicable within the corporate limits of the City of Grand Rapids: Customer ... $11.01 $3.94 $4.87 $6.22 $3.76 $4.64 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: ...

Pages