Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    14,153,205 17,186,187 17,201,201 (3,032,982) (15,014) Other Liabilities 11,469,345 9,280,217 9,760,312 ... Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ...

  2. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... longer be produced or imported as of 2019. In addition, the 52-year old piping in the floor contains slow ... COMPREHENSIVE FINANCIAL REPORT OF THE CITY OF GRAND RAPIDS, MINNESOTA For The Year Ended December 31, 2021 ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    Mapping 81,756 67,602 57,115 34,139 47,363------ Small tools 31,520 22,379 15,027 17,833 30,801 28,000 ... 0.6%-0.2%-2.1%-1.3%-3.9% 15.0% 5.0% 2.1%-0.9%-2.9%-3.6% CASH RESERVES Beginning of Year 1,520,146$ 4,118,902$ 4,521,158$ ... distribution Total Operating Expenses 15,206,145 11,444,987 2,904,090 778,699 78,369 page 2 of 3 Exhibit 3-A ...

  4. Distributed Energy Resources

    Public Utilities | Page

     ................................................................................................................... 15  11  Disputes ...  ......................................................................................................................... 15  11.1.  Procedures ... Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...

  5. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

     Funding Source Summary 9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... CP 2021‐2, 5th St SW (10th Ave ‐ 11th Ave) 100 CP 2021‐3, Industrial Park Utility Extention 101 Year Project Starts: 2022 ... 106 CP 2019‐2, GR/Cohasset Connection Trail Phase 2 107 Year Project Starts: 2024 ...

  6. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Fuli Detail I I!.ilt_\C1,4 t;..11.i: City Council Work Session Monday, June 25, 2012 4:00 PM Conference ... Item Status: CC Worksession File created: 6/11/2012 In control: City Council Work Session On agenda: ... 1 Printed on 6/25/2012 powered by 1_egistar"”' CITY OF GRAND RAPIDS IY ll JfZf):\15 Legislation ...

  7. Data Request

    Police | Page

    $10.00 per parcel GIS Technician $32.47/Hour FINANCE DEPARTMENT Assessment Certificates $15.00 Fax $2.00 ... Soccer) pay $5.00 per player per year to use our fields. Adults pay $15.00 per player. POLICE DEPARTMENT ... $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ...

  8. City Council Regular Meeting

    City Council | Calendar Event | 07/13/15 04:00pm

    5: 15 DEPARTMENT HEAD REPORT PM 11. 15-1391 Engineering Department — Julie Kennedy 5: 25 CIVIC ... Debt Service Reserve 5, 000 11 E ui ment Certificates of 2009D 159,000 144,000 15,000 172,000 12 Grant ... (WithText) File #: Version: Name: 15-14591Performanceeval Type: Status: AgendaItemPassed Filecreated: ...

  9. Basic Wood Framing

    Community Development | Page

    1 1-8 1 1-5 2 2-2×6 2-11 2 2-7 2 2-3 2 2-2×8 3-9 2 3-3 2 2-11 3 2-2×10 4-7 3 4-0 3 3-6 3 2-2×12 5-4 ... 2 3-3 2 2-11 2 2-2×8 4-9 2 4-2 2 3-9 2 2-2×10 5-9 2 5-1 2 4-7 3 2-2×12 6-8 2 5-10 3 5-3 3 3-2×8 5-11 ... 3 4-7 3 4-1 4 3-2×8 4-8 2 4-1 2 3-8 2 3-2×10 5-9 2 4-11 2 4-5 3 3-2×12 6-8 2 5-9 2 5-2 3 4-2×8 5-5 2 4-8 ...

  10. 2023 Adopted Levy and Tax Rate

    Finance | Page

    $11,129,938 Net amount levied to property owners $7,975,967 TAX TAXABLE NET CITY CEMETERY TOTAL YEAR TAX ... Page Categories 2023 Adopted Levy and Tax Rate Sort A to Z 2023_levy_and_tax_rate.pdf 2018 Levy 2019 ... Levy 2020 Levy 2021 Levy 2022 Levy Payable 2019 Payable 2020 Payable 2021 Payable 2022 Payable 2023 ...

Pages