Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ... Combining Schedules of Revenues and Expenses 43 Electric Department – Detailed Schedule of Revenues and ...

  2. 2022 Cost of Service Studies

    Public Utilities | Page

    examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... first year of the new contract, GRPUC set the PPAC adjustment at $0.01583/kWh. For future years in the ... Rates- 3- formula. Table 2-1 lists the PPAC rates for each year as included in the projections. The new ...

  3. Financial Reports

    Finance | Page

    evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... 2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... number of permits issued, the 2021 total of 526 permits was below the 10 year average of 550. We expect ...

  4. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Department 10,000 Library 26 000 IRA Civic Center 49,200 Blandin Beach Park 2,025 Grand Rapids Sports Complex ... Mayor and City Administrator to sign the School Liaison Officer Agreement for the 2012-2013 school year ... the City of Grand Rapids has adopted and implemented 10 performance measures developed by the Council ...

  5. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

     Funding Source Summary 9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... CP 2021‐2, 5th St SW (10th Ave ‐ 11th Ave) 100 CP 2021‐3, Industrial Park Utility Extention 101 Year Project Starts: 2022 ... 106 CP 2019‐2, GR/Cohasset Connection Trail Phase 2 107 Year Project Starts: 2024 ...

  6. Utility Information

    Engineering / Public Works | Page

    can demonstrate the capacity to handle a 10-year or 100-year rain event can receive a stormwater ... able to retain the 10-year, 24-hour type II SCS storm event. To qualify for this credit, the property ... not be developed in any way, or have been developed in the past ten (10) years. The property must ...

  7. GROW Grand Rapids 2040 Comprehensive Plan

    Community Development | Page

    a 10-year period found that where contamination standards for drinking water were exceeded, water suppliers ... to 10 years for wastewater treatment facilities. These examples highlight the need for citizen-driven ... Services Appendix A: Maps Maps: Figures 4.3- 7.2 Maps: Figures 7.3- 7.5 Maps: Figures 8.1- 8.9 Maps: ...

  8. Distributed Energy Resources

    Public Utilities | Page

    completed Interconnection Applications in a year. The public queue will be updated, at  minimum, on a monthly basis.    4.3. Interconnection Application Process Fees  ... Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...

  9. Stormwater Credits Policy

    Engineering / Public Works | Page

    stormwater utility charges. Only those properties that can demonstrate the capacity to handle a 10-year or ... quantity management tools/practices being able to retain the 10-year, 24-hour type II SCS storm event. To ... charge. The property must not be developed in any way, or have been developed in the past ten (10) years ...

  10. Complete 3.2 Beer Application

    Administration | Page

    Notary Stamp: Date:____________________________ LIC 04 (5/15) Certificate of Compliance Minnesota ... during the current year will amount to less than $__________________*.__________________________________, ... sales of non-intoxicating malt liquor during the current year will amount to less than ...

Pages