Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ... OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 FINANCIAL SECTION (cont.) ...

  2. Data Request

    Police | Page

    signature below. Signature: Date: 10 Approved by the City Council on xx/xx/03 IDENTITY VERIFIED BY: ... $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ... Certification Service $5.00/Instance 3.5" x 5" Photo Prints $10.00 base plus $0.25/photo 8" ...

  3. Stormwater Credits Policy

    Engineering / Public Works | Page

    Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... stormwater utility charges. Only those properties that can demonstrate the capacity to handle a 10-year or ... quantity management tools/practices being able to retain the 10-year, 24-hour type II SCS storm event. To ...

  4. Financial Reports

    Finance | Page

    evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... 2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... number of permits issued, the 2021 total of 526 permits was below the 10 year average of 550. We expect ...

  5. Grand Rapids Monitoring Results

    Public Utilities | Page

    Sources Nitrate 10 ppm 10.4 ppm 0.3 ppm N/A NO Runoff from fertilizer use; Leaching from septic tanks, ... Water Quality Data Tables The tables below show the contaminants we found last year or the most recent ... tables. We sample for some contaminants less than once a year because their levels in water are not ...

  6. Utility Information

    Engineering / Public Works | Page

    can demonstrate the capacity to handle a 10-year or 100-year rain event can receive a stormwater ... able to retain the 10-year, 24-hour type II SCS storm event. To qualify for this credit, the property ... not be developed in any way, or have been developed in the past ten (10) years. The property must ...

  7. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    Groom, Recorder GREDA Regular Meeting 2 Thursday, February 28, 2019 DATE: 03/ 22/ 2019 TIME: 11: 08: 07 ... INVOICES DUE ON/ BEFORE 03/ 28/ 2019 PAGE: 1 VENDOR # NAME AMOUNT DUE EDA- CAPITAL PROJECTS AIRPORT SOUTH ... have a term of 10 years from the date of execution hereof. The principal of the Fund will be retained ...

  8. Electric Distribution

    Public Utilities | Page

    September 1, 2015. In addition, beginning in 2019, the generation capacity charge for each year is based on ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  9. Public Information Requests

    Administration | Page

    signature below. Signature: Date: 10 Approved by the City Council on xx/xx/03 IDENTITY VERIFIED BY: ... by the City Council on xx/xx/03 City of Grand Rapids Data Access Procedures Introduction These ... “Act”), specifically MN stat. Sec. 13.03, Subd. 2 and 13.05, Subd. 5 and 8. The Minnesota Data Practices ...

  10. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

     Funding Source Summary 9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... CP 2021‐2, 5th St SW (10th Ave ‐ 11th Ave) 100 CP 2021‐3, Industrial Park Utility Extention 101 Year Project Starts: 2022 ... 106 CP 2019‐2, GR/Cohasset Connection Trail Phase 2 107 Year Project Starts: 2024 ...

Pages