Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ... OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 FINANCIAL SECTION (cont.) ...

  2. Data Request

    Police | Page

    stat. Sec. 13.03, Subd. 2 and 13.05, Subd. 5 and 8. The Minnesota Data Practices Act establishes ... on xx/xx/03 City of Grand Rapids Data Access Procedures Introduction These procedures are adopted to ... problems in obtaining access to data may be directed. 2 Approved by the City Council on xx/xx/03 Categories ...

  3. Stormwater Credits Policy

    Engineering / Public Works | Page

    Ordinance No. 17-05-03) Background On May 8, 2017, the Grand Rapids City Council approved a Stormwater ... Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... a determination of the credit once per calendar year. If the credit is approved, the credit will be applied within ...

  4. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Mayor and City Administrator to sign the School Liaison Officer Agreement for the 2012-2013 school year ... a five (5) year contract for Refuse and Recycling Collection Services commencing August 1st, 2012. ... return to City Council Worksession on June 25, 2012 for further discussions. COUNCIL REPORTS 5:05 ...

  5. Utility Information

    Engineering / Public Works | Page

    Practices Credit Policy (As per Section 70-203(b) of Ordinance No. 17-05-03) Background On May 8, 2017, the ... Grand Rapids City Council approved a Stormwater Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, ... year is as follows: 2023: Single Family $8.75 per month. Multi-Family $31.98 per acre per month. ...

  6. Public Information Requests

    Administration | Page

    “Act”), specifically MN stat. Sec. 13.03, Subd. 2 and 13.05, Subd. 5 and 8. The Minnesota Data Practices ... by the City Council on xx/xx/03 City of Grand Rapids Data Access Procedures Introduction These ... 2 Approved by the City Council on xx/xx/03 Categories of Data All government data falls into one of three ...

  7. Grand Rapids Monitoring Results

    Public Utilities | Page

    Water Quality Data Tables The tables below show the contaminants we found last year or the most recent ... tables. We sample for some contaminants less than once a year because their levels in water are not ... expected to change from year to year. If we found any of these contaminants the last time we sampled for ...

  8. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... longer be produced or imported as of 2019. In addition, the 52-year old piping in the floor contains slow ... COMPREHENSIVE FINANCIAL REPORT OF THE CITY OF GRAND RAPIDS, MINNESOTA For The Year Ended December 31, 2021 ...

  9. 2022 Cost of Service Studies

    Public Utilities | Page

    examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... first year of the new contract, GRPUC set the PPAC adjustment at $0.01583/kWh. For future years in the ... Rates- 3- formula. Table 2-1 lists the PPAC rates for each year as included in the projections. The new ...

  10. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    106 CP 2019‐2, GR/Cohasset Connection Trail Phase 2 107 Year Project Starts: 2024 ... 1 City Council Resolution Adopting the 2021 ‐ 2025 2‐3 City of Grand Rapids Amended Capital Improvement Plan Five Year ...  Plan Summary of Project Costs 4‐6 Five Year Plan Summary of Funding Sources by Category 7‐8 Five Year ...

Pages