Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    Investment income (loss) (86,061) 20,730 30,745 (106,791) (10,015) Demand interest payments 470,362 445,886 ... Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ...

  2. Data Request

    Police | Page

    Merchant (Resolution No. 06-110) $150.00 per year Permit to keep Chickens $20.00 per year CENTRAL SCHOOL ... (new) $40.30 $26.20 $1.00 $67.50 Residential Window replacement $60.00 $1.00 $61.00 Furnace Replacement ... $40.30 $26.20 $1.00 $67.50 Water Heater/Softener $40.30 $26.20 $1.00 $67.50 Replace sink, toilet, faucet, ...

  3. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    106 CP 2019‐2, GR/Cohasset Connection Trail Phase 2 107 Year Project Starts: 2024 ... utilize it. Budget Impact/Other Useful Life 30 years Project Name RWY 16/34- Reconstruction Category ... equipment in an area without trees. Budget Impact/Other Useful Life 30 years Project Name Beacon Relocation ...

  4. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... longer be produced or imported as of 2019. In addition, the 52-year old piping in the floor contains slow ... possibility of Title IX lawsuits. The IRA Civic Center exceeds 200,000 visitors per year, hosts over 30 dry ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    17.6% 18.0%-2.2% Demand & Energy 36.1% 35.4% 2.0% Industrial 9.7% 9.3% 3.8% Load Management 3.0 ... examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... first year of the new contract, GRPUC set the PPAC adjustment at $0.01583/kWh. For future years in the ...

  6. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 $20.00 $25.00 $35.00 $50.00 Commodity ...

  7. GROW Grand Rapids 2040 Comprehensive Plan

    Community Development | Page

    20 years just to keep pace with the demand for drinking water. A 1998 assessment by the Pollution ... progress and changing the plan in future years as needed WINONA COUNTY’S “UPDATE 2000” Winona County ... a 10-year period found that where contamination standards for drinking water were exceeded, water suppliers ...

  8. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Lessee for a period of twenty (20) years beginning January l, 2012 and ending on December 31, 2031. 3) ... RENEWAL OPTION. This lease may be renewed and extended in twenty (20) year increments, at the same terms ... Mayor and City Administrator to sign the School Liaison Officer Agreement for the 2012-2013 school year ...

  9. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Simplified Process (under 20kW capacity)  c. Fast Track Process (see applicability within)  d. Study Process (see applicability within)  2. ... DER Technology  Size Limitations  Simplified Process  Certified Inverter only  20 kW AC  Fast Track Process  ...

  10. City Council Regular Meeting

    City Council | Calendar Event | 05/14/12 04:00pm

    final.pdf McKown Proposal- Exhibit A.pdf 20. 12-0272 Consider adopting a resolution supporting a 30 unit ... Information: For the last several years, the City has adopted a Five Year Capital [mprovement Plan (C[P) that ... Comparison for Years 2011-2016. Requested Citv Council Action Discuss the 2012- 2016 Capital Improvement ...

Pages