Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ... OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 FINANCIAL SECTION (cont.) ...

  2. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... longer be produced or imported as of 2019. In addition, the 52-year old piping in the floor contains slow ... COMPREHENSIVE FINANCIAL REPORT OF THE CITY OF GRAND RAPIDS, MINNESOTA For The Year Ended December 31, 2021 ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... first year of the new contract, GRPUC set the PPAC adjustment at $0.01583/kWh. For future years in the ...

  4. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Mayor and City Administrator to sign the School Liaison Officer Agreement for the 2012-2013 school year ... DEPARTMENT p.m. 16. 12-0404 Authorization to begin the process of filling the Building Official vacancy. 5:30 ... a five (5) year contract for Refuse and Recycling Collection Services commencing August 1st, 2012. ...

  5. Data Request

    Police | Page

    $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ... Data not on Individuals Meaning of Classification Public MS §13.02, subd. 15 Public MS §13.02, subd. 15 ... Public MS §13.02, subd. 4 Available to anyone for any reason Private MS §13.02, subd. 12 Private MS ...

  6. City Council Regular Meeting

    City Council | Calendar Event | 05/14/12 04:00pm

    increase 17.45% 2.47% 16.37% 32.72% 11.88% Miles of street improvements 0.36 1.20 4.89 6.13 0.63 5/9/2012 ... for the 2012 plan year and authorize payment of the insurance premium including the agent fee. 16 ... Information: For the last several years, the City has adopted a Five Year Capital [mprovement Plan (C[P) that ...

  7. City Council Regular Meeting

    City Council | Calendar Event | 07/13/15 04:00pm

    the Council entrance. 5: 02 PUBLIC FORUM PM 5: 07 COUNCIL REPORTS PM 5: 10 APPROVAL OF MINUTES PM ... VERIFIED CLAIMS PM 16. 15-1462 Consider approving the verified claims for the period June 16, 2015 to July ... Rapids- Itasca County Airport for Federal Fiscal Year 2015. Approved by consent roll call CITY OF GRAND ...

  8. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

     Funding Source Summary 9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... 106 CP 2019‐2, GR/Cohasset Connection Trail Phase 2 107 Year Project Starts: 2024 ... utilize it. Budget Impact/Other Useful Life 30 years Project Name RWY 16/34- Reconstruction Category ...

  9. Basic Wood Framing

    Community Development | Page

    material on edge 2X Bottom plate 2X studs 16” or 24” O.C. 2X Double top plate 2 TABLE R602.3(5) SIZE, ... Laterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24c 16 ... c — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ...

  10. GROW Grand Rapids 2040 Comprehensive Plan

    Community Development | Page

    Services Appendix A: Maps Maps: Figures 4.3- 7.2 Maps: Figures 7.3- 7.5 Maps: Figures 8.1- 8.9 Maps: ... progress and changing the plan in future years as needed WINONA COUNTY’S “UPDATE 2000” Winona County ... a 10-year period found that where contamination standards for drinking water were exceeded, water suppliers ...

Pages