Page not found
Search results
-
2023 Electric Security Light Rates
Public Utilities | Page$13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ... – Existing Pole 4200 Lumens 40 Watt LED LAMPS – Separate Pole 6600 Lumens 70 Watt LED LAMPS – Existing Pole ... and replacement fixtures will be either 40 or 70 watt LED lamps. All other fixture types shall be ...
-
Public Utilities Financial Reports
Public Utilities | Page2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... effluent per day; 4.0 million gallons from UPM/Blandin Paper Company and 1.5 million gallons from domestic ... AMI and AMR data. SEH was hired in 2020 to complete updates to the Comprehensive Water and Wastewater ...
-
Economic Development Authority Regular Meeting
Economic Development Authority | Calendar Event | 02/08/18 04:00pmFEBRUARY 8, 2018 CITY OF GRAND RAPIDS DEPARTMENT SUMMARY REPORT INVOICES DUE ON/ BEFORE 02/ 08/ 2018 PAGE: ... Minnesota Energy Resources $ 48. 09 P.U.0 $ 984.08 The Northspan Group Inc $ 1, 500.00 The following voted ... Meeting 2Thursday, January 11, 2018 DATE: 02/ 02/ 2018 TIME: 13: 11: 57 ID: AP443000. CGR EDA BILL LIST- ...
-
2022 Cost of Service Studies
Public Utilities | Pageprojected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 2-A 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Historical Projected Grand Rapids Public ...
-
City Council Regular Meeting
City Council | Calendar Event | 05/14/12 04:00pmAdministrator CITYOF GRAND RAPIDS Page 1 Printed on 5H1/2012 C I TY O F G RAN D RAP I DS C40 NORTH AVE. GttANU ... 125,000 City Wide Overlays-Rural 2014l2013-2 1 40,000 40,000 21st St SW (3rd Ave to Horseshoe Lk Rd) ... Assessmems 40,000 40,000 GO Bonds 155,000 155,000 21st St SW (3rd Ave to Horseshoe Lk Rd) 2015/2003 ...
-
2021-2025 Amended Capital Improvement Plan
Finance | Page9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... improvements described in the capital improvement plan. 1.02. Before the approval of the capital improvement ... as a whole. The Plan is hereby approved. 2.02 City staff are hereby authorized to do all other things ...
-
Maintenance Workers – Seasonal/Temporary
Engineering / Public Works | Job Openingconditions. Applicants should be available to work up to 40 hours per week, Monday – Friday, with some ...
-
Kill A Watt Meter
Grand Rapids Area Library | Pagea 2-week loan from the library at 140 NE 2nd Street, Grand Rapids. To reserve a Kill A Watt meter, call the ... cumulative kilowatt-hours of energy usage, and displays volts, amps, and watts at a 0.2% accuracy rating. ...
-
Data Request
Police | PageData not on Individuals Meaning of Classification Public MS §13.02, subd. 15 Public MS §13.02, subd. 15 ... Public MS §13.02, subd. 4 Available to anyone for any reason Private MS §13.02, subd. 12 Private MS ... §13.10, subd. 1B Nonpublic MS §13.02, subd. 9 Available only to the data subject and to anyone authorized ...
-
Permit Fee Calculator
Community Development | Page$0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... $800.00 $34.25 $22.26 $0.40 $56.91 $2,001.00- $25,000.00 Project Cost Permit Fee Plan Review Fee State ... Surcharge Total Fee $4,000.00 $98.40 $63.96 $2.00 $164.36 No Plan Review Total $100.40 $25,001.00- ...