Page not found

Search results

  1. 2023 Electric Security Light Rates

    Public Utilities | Page

    Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... – Schedule of Expenses 55 Combined Schedule of Administrative, General and Customer Accounts Expense 56 ... to 22.9 kV for distribution to 6 major substations, 5 rural step-down stations, or directly ...

  3. 2023 City Water Rates

    Public Utilities | Page

    $11.01 $3.94 $4.87 $6.22 $3.76 $4.64 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: ... Effective/Billed After: 01-01-2023 Applicable within the corporate limits of the City of Grand Rapids: Customer ... Gallons Next 22,000 Gallons All Gallons Over 30,000 City Commercial First 40,000 Gallons Next 360,000 ...

  4. Financial Reports

    Finance | Page

    2020 Assets: Current and other assets $22,028,726 $23,219,060 $752,040 $394,602 $22,780,766 $23,613,662 ... and Changes in Fund Balance- Nonmajor Special Revenue Funds Statement 22 124 Subcombining Balance ... sites in this redevelopment began in the fall of 2020. A permit application has been submitted for ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    contract with MP which became effective 1/1/22 has a significant impact on the overall results. An overall ... center. The combined capital improvements for the electric utility are shown in Table 2-2 below. Projected ... Operating Results – Existing Rates- 5- Table 2-2 Capital Improvements Capital Item 2022 2023 2024 2025 2026 ...

  6. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... All kWh/mo@ $0.1111/kWh All kWh/mo @ $0.0557/kWh Demand: All kW@ $17.64/kW 12/14/2022 01/01 ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ...

  7. Basic Wood Framing

    Community Development | Page

    (JACK STUDS) One floor only 2-2X4 3-1 (1) 2-11 (1) 2-8 (1) 2-7 (1) 2-2X6 4-6 (1) 4-3 (1) 3-11 (1) 3-9 ... (1) 2-2X8 9-1 (1) 5-4 (1) 5-0 (2) 4-9 (2) 2-2X10 7-0 (2) 6-7 (2) 6-1 (2) 5-9 (2) 2-2X12 8-1 (2) 7-7 ... 9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ...

  8. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ... 11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ...

  9. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 150 over 150 6 $5.71 $3.99 $38.25 0 24 25 48 49 180 over 180 7 $5.71 $3.99 $43.96 0 28 29 56 57 210 ... 12 $5.71 $3.99 $72.51 0 48 49 96 97 360 over 360 13 $5.71 $3.99 $78.22 0 52 53 104 105 390 over 390 ...

  10. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... Blandin Beach House Demo 20 Blandin Beach Restrooms 21 Blandin Beach Pavilion 22 New Fire Hall/Police Evidence 23 Building ... PU/PW Joint Facility Center Improvements 55‐56 Cemetery Bathroom Upgrades 57 CITY OF GRAND RAPIDS AMENDED CAPITAL IMPROVEMENT PLAN 2021- ...

Pages