Page not found

Search results

  1. Basic Wood Framing

    Community Development | Page

    3-2X12 10-2 (2) 9-6 (2) 8-10 (2) 8-3 (2) 4-2X8 9-0 (1) 8-3 (1) 7-8 (1) 7-3 (1) 4-2X10 10-1 (1) 9-5 (1) ... 4-7 (2) 4-3 (2) 4-1 (3) 2-2X12 5-9 (2) 5-5 (3) 5-0 (3) 4-9 (3) 3-2X8 5-1 (2) 4-9 (2) 4-5 (2) 4-2 (2) ... 3-2X10 6-2 (2) 5-9 (2) 5-4 (2) 5-1 (2) 3-2X12 7-2 (2) 6-9 (2) 6-3 (2) 5-11 (3) 4-2X8 6-1 (1) 5-8 (2) 5-3 ...

  2. Decks

    Community Development | Page

    22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... SPAN (ft) 6’ and less 6’1” to 8’ 8’1” to10’ 10’1” to 1212’1” to 14’ 14’1” to 16’ 16’1” to 18 ... ’ CONNECTION DETAILS ON-CENTER SPACING OF FASTENERS4,5 ½” DIAM. LAG SCREW WITH 15/32” SHEATHING1 30 23 18 15 13 ...

  3. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ... F S 1 2 3 4 1 2 1 2 3 4 5 6 7 5 6 7 8 9 10 11 3 4 5 6 7 8 9 8 9 10 11 12 13 14 12 13 14 15 16 17 18 10 11 12 13 14 15 16 15 16 17 18 19 20 21 ...

  4. Public Utilities Financial Reports

    Public Utilities | Page

    expense of $1,813,215, or 13.32% and distribution of $167,523 or 12.63% are offset by increases in the ... or 27.12%, and increases in domestic treatment of $51,569 or 9.32% along with increases in other ... iron distribution mains consisting mostly of 6”, 8” and 12” pipe. The GRPUC is responsible for the ...

  5. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  Energy Resource ............................................................................................ 2  1.2.  Point of Common Coupling (PCC) / Point of DER Connection (POC) ............................... 2  ...  .......................................................................................................................... 3  3.2.  Importance ...

  6. 2022 Cost of Service Studies

    Public Utilities | Page

    29,400 30,282 31,190 32,126 33,090 Safety 21,887 18,731 12,098 29,396 30,613 17,000 17,850 18,386 18 ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ... /14/2022 Wastewater Cost of Service Study- Adopted 12/14/2022 Image Slideshow Display Contact Info Block Web Page Menu ...

  7. Garages: One Story

    Community Development | Page

    2-2X12 2 7-6 2-2X12 2 7-0 3-2X10 2 6-4 3-2X10 2 6-8 3-2X8 2 8-2 3-2X12 2 7-4 3-2X12 2 8-2 3-2X10 2 8-2 ... 4-2x10 2 8-2 4-2X10 2 9-5 3-2X12 2 9-5 4-2X12 2 8-5 4-2x12 2 Over 12 ft *EWPR *EWPR Over 10 ft *EWPR ... (at least 1/8” = 1 ft. min.). They may be on 8 ½ X 11 paper. Plans must include a site plan, floor ...

  8. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    wq-strm4-49a • 9/ /20 Page 12 of 32 MCM 4: Construction site stormwater runoff control • 651-296-6300 ... wq-strm4-49a • 9/ /20 Page 18 of 32 (Note: All or some of this item is a new permit requirement. Compliance ... formats https://www.pca.state.mn.us wq-strm4-49a • 9/ /20 Page 1 of 32 MS4 Part 2 Permit Application ...

  9. Financial Reports

    Finance | Page

    General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ... Statement 18 110 Notes to Required Supplementary Information 111 CITY OF GRAND RAPIDS, MINNESOTA TABLE OF ... Haz-Mat Statement 31 148 Police Forfeiture Statement 32 149 Cemetery Statement 33 150 Domestic Animal ...

  10. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    /14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ... 05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... 2023 Electric Rural Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact Info Block ...

Pages