Page not found

Search results

  1. Basic Wood Framing

    Community Development | Page

    9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ... 3-2X10 6-2 (2) 5-9 (2) 5-4 (2) 5-1 (2) 3-2X12 7-2 (2) 6-9 (2) 6-3 (2) 5-11 (3) 4-2X8 6-1 (1) 5-8 (2) 5-3 ... 2 3-3 2 2-11 2 2-2×8 4-9 2 4-2 2 3-9 2 2-2×10 5-9 2 5-1 2 4-7 3 2-2×12 6-8 2 5-10 3 5-3 3 3-2×8 5-11 ...

  2. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Simplified Process (under 20kW capacity)  c. Fast Track Process (see applicability within)  d. Study Process (see applicability within)  2. ...  Terminology .................................................................................................................. 2  1.1.  Distributed ...

  3. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... Blandin Beach House Demo 20 Blandin Beach Restrooms 21 Blandin Beach Pavilion 22 New Fire Hall/Police Evidence 23 Building ... CP 2021‐2, 5th St SW (10th Ave ‐ 11th Ave) 100 CP 2021‐3, Industrial Park Utility Extention 101 Year Project Starts: 2022 ...

  4. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ... F S 1 2 3 4 1 2 1 2 3 4 5 6 7 5 6 7 8 9 10 11 3 4 5 6 7 8 9 8 9 10 11 12 13 14 12 13 14 15 16 17 18 10 11 12 13 14 15 16 15 16 17 18 19 20 21 ...

  5. Public Utilities Financial Reports

    Public Utilities | Page

    Information 38 – 41 Supplementary Information 2022 Combining Schedules of Revenues and Expenses 42 2021 ... economy. Recent annexations have increased the City’s population from 8,543 in 2005 to 11,283 in 2022. ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ...

  6. 2022 Cost of Service Studies

    Public Utilities | Page

    19,505 20,090 Seminar/training 41,493 12,554 12,617 11,590 11,401 12,000 12,600 12,978 13,367 13,768 ... 5,047------ Street lighting--- 2,158------- Meters 1,320 11,890 2,316 4,168 42,513 500 525 541 557 574 591 ... 2.0% 53.3% Lighting 1.1% 1.2%-7.8% Total 100.0% 100.0% 0.0% Cost-of-Service- 7- As indicated above, ...

  7. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... Transmittal 3 Certificate of Achievement 9 Principal City Officials and Department Heads 11 Organization Chart ... Governmental Funds to the Statement of Activities Statement 5 42 Statement of Net Position- Proprietary Funds ...

  8. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... over 570 20 $5.71 $3.99 $118.19 0 80 81 160 161 600 over 600 21 $5.71 $3.99 $123.90 0 84 85 168 169 630 ...

  9. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 $20.00 $25.00 $35.00 $50.00 Commodity ... Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 5/8"-3/4" 1" 1 ¼" 1 ½" 2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 ...

  10. Garages: One Story

    Community Development | Page

    (at least 1/8” = 1 ft. min.). They may be on 8 ½ X 11 paper. Plans must include a site plan, floor ... SIZES FOR GARAGES 20, 24, AND 28 FT WIDE 20 Ft WIDE 28 Ft WIDE 26 Ft WIDE Span Header Size # Jack Studs ... Span Header Size # Jack Studs Span Heade r Size # Jack Studs 2-10 2-2X4 1 2-6 2-2X4 1 2-3 2-2X6 1 4-2 ...

Pages