Page not found

Search results

  1. Basic Wood Framing

    Community Development | Page

    — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... SUPPORTING SIZE BUILDING WIDTH (FT) 20 24 28 32 SPAN (JACK STUDS) SPAN (JACK STUDS) SPAN (JACK STUDS) SPAN ... (2) 7-0 (2) 6-7 (2) 3-2X8 7-2 (1) 6-9 (1) 6-3 (1) 5-11 (2) 3-2X10 8-9 (1) 8-2 (1) 7-7 (2) 7-2 (2) ...

  2. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Simplified Process (under 20kW capacity)  c. Fast Track Process (see applicability within)  d. Study Process (see applicability within)  2. ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    Investment income (loss) (86,061) 20,730 30,745 (106,791) (10,015) Demand interest payments 470,362 445,886 ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  4. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... F S 1 2 3 4 1 2 1 2 3 4 5 6 7 5 6 7 8 9 10 11 3 4 5 6 7 8 9 8 9 10 11 12 13 14 12 13 14 15 16 17 18 10 11 12 13 14 15 16 15 16 17 18 19 20 21 ... Z 2023_wm_calender.pdf S M T W TH F S S M T W TH F S S M T W TH F S 1 2 3 4 1 2 3 4 1 2 3 4 5 6 7 5 6 7 8 9 10 11 ...

  5. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... over 210 8 $5.71 $3.99 $49.67 0 32 33 64 65 240 over 240 9 $5.71 $3.99 $55.38 0 36 37 72 73 270 over ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ...

  6. Financial Reports

    Finance | Page

    evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... 2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ...

  7. 2022 Cost of Service Studies

    Public Utilities | Page

    2027 Operating Revenues $19,061,765 $18,448,198 $18,977,138 $19,515,558 $20,064,303 $20,624,106 Less ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ...

  8. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    formats https://www.pca.state.mn.us wq-strm4-49a • 9/ /20 Page 1 of 32 MS4 Part 2 Permit Application ... wq-strm4-49a • 9/ /20 Page 2 of 32 I certify under penalty of law that this document and all attachments were ... wq-strm4-49a • 9/ /20 Page 3 of 32 MCM 1: Public education and outreach (Note: All or some of this item is ...

  9. Garages: One Story

    Community Development | Page

    2-2X12 2 7-6 2-2X12 2 7-0 3-2X10 2 6-4 3-2X10 2 6-8 3-2X8 2 8-2 3-2X12 2 7-4 3-2X12 2 8-2 3-2X10 2 8-2 ... 4-2x10 2 8-2 4-2X10 2 9-5 3-2X12 2 9-5 4-2X12 2 8-5 4-2x12 2 Over 12 ft *EWPR *EWPR Over 10 ft *EWPR ... SIZES FOR GARAGES 20, 24, AND 28 FT WIDE 20 Ft WIDE 28 Ft WIDE 26 Ft WIDE Span Header Size # Jack Studs ...

  10. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    20,00020,000Storage Area Network Device Replacement 1 2022/IT-3 10,00010,000City and Police Firewall Replacement ... 10,00010,000Golf Course Security System Upgrade 3 2022/GC-1 100,00080,000 20,000Golf Course Maintenance Bldg ... 9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ...

Pages