Page not found

Search results

  1. 2023 Electric Security Light Rates

    Public Utilities | Page

    Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ...

  2. Waste Management

    Engineering / Public Works | Page

    23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ... 11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ... 26 27 28 29 21 22 23 24 25 26 27 25 26 27 28 29 30 30 28 29* 30 31 S M T W TH F S S M T W TH ...

  3. Economic Development Authority Meeting

    Economic Development Authority | Calendar Event | 09/23/21 04:00pm

    Meeting with Agenda and Minutes Thursday, September 23, 2021- 4:00pm Agenda Minutes Video Image ... GRAPIDSMN crivers@agendapal.com 387951de-aca8-4ceb-a09f-6ea1dd345e38 Sort A to Z Agenda (HTML) Agenda Packet ...

  4. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ...

  5. Public Utilities Financial Reports

    Public Utilities | Page

    a cost of $2.3 million dollars, and financed through reserves. The Tioga 115 kV to 22.9 kV substation was ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ... in over a decade. In 2019, when GRPUC conducted the electric utility study, the AMI and AMR water ...

  6. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  Interconnection Coordinator .................................................................................... 3  2.3.  Interconnection ...   The contact information of the DER Interconnection Coordinator will be posted on the  Area EPS Operator’s website if feasible, or available from the utility.     2.3 ...

  7. City Council Regular Meeting

    City Council | Page | 09/23/19 04:00pm

    Meeting with Agenda and Minutes Monday, September 23, 2019- 4:00pm Agenda Agenda Work Session ...

  8. Community Development Fee Schedule

    Community Development | Page

    Z community_development_fee_schedule_7-1-15_final-most_current.pdf COMMUNITY DEVELOPMENT Fee Schedule (as of July 1, 2015) Building Permits $1.00- $500.00 $23 ... .50* $501.00- $2,000.00 $23.75* for the first $500.00 plus $3.50 for each additional $100.00 or fraction ... (3-27-06) $54.85* $35.65 $1.00 $91.50 Emergency Number Sign (10-13-09) $50.00 each Comprehensive Plan ...

  9. Data Request

    Police | Page

    Signature: Date: Date Notified:data_practices_procedures_adopted_1-23-23.pdf 1 Approved by the City Council ... Signature:city_fee_schedule_-_adopted_1-23-23.pdf DEPARTMENTAL FEE SCHEDULE FOR CITY SERVICES Effective Date: 01/23/2023 CITY WIDE FEES Photo copy ... DEVELOPMENT Building Permits $1.00- $500.00 $23.50 * $501.00- $2,000.00 $23.75 * for the first $500.00 plus ...

  10. Electric Distribution

    Public Utilities | Page

    September 1, 2015. In addition, beginning in 2019, the generation capacity charge for each year is based on ... kV to 22.9 kV substation was constructed in 2005 at the cost of $2.3 million dollars and financed ...

Pages