Page not found

Search results

  1. Grand Rapids Pavement Art RFQ

    Arts & Culture Commission | Bid/RFP

    Reservation; Native Americans are the largest racial/ethnic minority in Itasca County (4.9%). The City’s name ... residents The Pavement Art Project In 2019, the Arts and Culture Commission installed The Memory of Water by ... visit:https://www.themilliganstudio.com/the-memory-of-water/cmjf05m7afek8w35xpdvc5pldlyhpu This year the Arts and Culture Commission will commission temporary pavement art that will last ...

  2. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28.00 ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ...

  3. Sales Tax Fact Sheet

    Administration | Page

    10/1/2019 Note: The following cities also have a $20 vehicle excise tax on sales of motor vehicles made by ... sales tax. What’s New April 1, 2022:  Koochiching County will have a 0.5% Transit Sales and Use Tax ... January 1, 2022:  Roseau County has a 0.5% Transit Sales and Use Tax October 1, 2021:  Washington County ...

  4. Public Utilities Financial Reports

    Public Utilities | Page

    Collection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... aeration, gravity filtration, and zeolite softening. Treated water is stored in a 0.5 million gallon ... system includes three 0.5 million gallons elevated storage reservoirs and 81 miles of cast and ductile ...

  5. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    formats https://www.pca.state.mn.us wq-strm4-49a • 9/ /20 Page 1 of 32 MS4 Part 2 Permit Application ... wq-strm4-49a • 9/ /20 Page 2 of 32 I certify under penalty of law that this document and all attachments were ... wq-strm4-49a • 9/ /20 Page 3 of 32 MCM 1: Public education and outreach (Note: All or some of this item is ...

  6. 2022 Cost of Service Studies

    Public Utilities | Page

    2027 Operating Revenues $19,061,765 $18,448,198 $18,977,138 $19,515,558 $20,064,303 $20,624,106 Less ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ...

  7. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... Notes to Financial Statements 49 Required Supplementary Information: Budgetary Comparison Schedule- ... Expenditures and Changes in Fund Balance- Nonmajor Governmental Funds Statement 20 119 Subcombining Balance ...

  8. Basic Wood Framing

    Community Development | Page

    — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... SUPPORTING SIZE BUILDING WIDTH (FT) 20 24 28 32 SPAN (JACK STUDS) SPAN (JACK STUDS) SPAN (JACK STUDS) SPAN ... (1) 2-2X8 9-1 (1) 5-4 (1) 5-0 (2) 4-9 (2) 2-2X10 7-0 (2) 6-7 (2) 6-1 (2) 5-9 (2) 2-2X12 8-1 (2) 7-7 ...

  9. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    over 1,470 50 $5.71 $3.99 $289.49 0 200 201 400 401 1,500 over 1,500 51 $5.71 $3.99 $295.20 0 204 205 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... 150 over 150 6 $5.71 $3.99 $38.25 0 24 25 48 49 180 over 180 7 $5.71 $3.99 $43.96 0 28 29 56 57 210 ...

  10. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Simplified Process (under 20kW capacity)  c. Fast Track Process (see applicability within)  d. Study Process (see applicability within)  2. ... DER Technology  Size Limitations  Simplified Process  Certified Inverter only  20 kW AC  Fast Track Process  ...

Pages