Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    to 22.9 kV for distribution to 6 major substations, 5 rural step-down stations, or directly ... transformed to consumer applicable voltages. The main 115 kV to 22.9 kV substation was constructed in 2005 at ... a cost of $2.3 million dollars, and financed through reserves. The Tioga 115 kV to 22.9 kV substation was ...

  2. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 12 $5.71 $3.99 $72.51 0 48 49 96 97 360 over 360 13 $5.71 $3.99 $78.22 0 52 53 104 105 390 over 390 ... over 630 22 $5.71 $3.99 $129.61 0 88 89 176 177 660 over 660 23 $5.71 $3.99 $135.32 0 92 93 184 185 690 ...

  3. Basic Wood Framing

    Community Development | Page

    (JACK STUDS) One floor only 2-2X4 3-1 (1) 2-11 (1) 2-8 (1) 2-7 (1) 2-2X6 4-6 (1) 4-3 (1) 3-11 (1) 3-9 ... (1) 2-2X8 9-1 (1) 5-4 (1) 5-0 (2) 4-9 (2) 2-2X10 7-0 (2) 6-7 (2) 6-1 (2) 5-9 (2) 2-2X12 8-1 (2) 7-7 ... 9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    contract with MP which became effective 1/1/22 has a significant impact on the overall results. An overall ... center. The combined capital improvements for the electric utility are shown in Table 2-2 below. Projected ... Operating Results – Existing Rates- 5- Table 2-2 Capital Improvements Capital Item 2022 2023 2024 2025 2026 ...

  5. Financial Reports

    Finance | Page

    and Changes in Fund Balance- Nonmajor Special Revenue Funds Statement 22 124 Subcombining Balance ... evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... together with a parts distribution center. In September of 2019, 100% of the ASV shares were purchased by ...

  6. Permit Fee Calculator

    Community Development | Page

    $31,835.00 State did plan review 25% plan review fee: $2,987.54 $22,872.39 $5,000,001.00 AND OVER Project ... $0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... $800.00 $34.25 $22.26 $0.40 $56.91 $2,001.00- $25,000.00 Project Cost Permit Fee Plan Review Fee State ...

  7. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ... 11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ...

  8. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    ADJOURN Attest: Shawn Gillen, City Administrator CITYOF GRAND RAPIDS Page 1 Printed on 6/22/2012 CITY OF ... 1 Printed on 8/22/2012 City Councii Meeting Agenda Full Detail June 25, 2012 3. 12-0387 Authorizing the ... SETTING OF REGULAR AGENDA p.m. CITYOF GRAND RAPIDS Page 2 Printed on 6/22/2012 City Council Meeting Agenda ...

  9. 2023 Water Irrigation Rates

    Public Utilities | Page

    UTILITIES COMMISSION IRRIGATION WATER SERVICE RATE SCHEDULE Adopted: 03-08-2023 Effective/Billed After: ... calculated are per 1000 gallons per month Irrigation- Residential & Commercial All gallons $6.22 ...

  10. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  .......................................................................................................................... 2  2.2.  DER ...   Interconnection Coordinator. Official definitions of each entity are defined in the  Glossary (Section 13). Additional details are explained in the subsections below.    2.2 ...

Pages