Page not found
Search results
-
2023 City Multi-Family Water Rate Schedule
Public Utilities | Pageover 210 8 $5.71 $3.99 $49.67 0 32 33 64 65 240 over 240 9 $5.71 $3.99 $55.38 0 36 37 72 73 270 over ... 12 $5.71 $3.99 $72.51 0 48 49 96 97 360 over 360 13 $5.71 $3.99 $78.22 0 52 53 104 105 390 over 390 ... 510 18 $5.71 $3.99 $106.77 0 72 73 144 145 540 over 540 19 $5.71 $3.99 $112.48 0 76 77 152 153 570 ...
-
Grand Rapids Monitoring Results
Public Utilities | Pageof 20 NO Corrosion of household plumbing. Copper (11/14/18) 0 ppm 90% of homes less than 1.3 ppm 1.04 ... Sources Nitrate 10 ppm 10.4 ppm 0.3 ppm N/A NO Runoff from fertilizer use; Leaching from septic tanks, ... Test Result Range of Detected Test Results Violation Typical Sources Fluoride 4.0 ppm 4.0 ppm 0.72 ppm ...
-
2023 Water Irrigation Rates
Public Utilities | PageUTILITIES COMMISSION IRRIGATION WATER SERVICE RATE SCHEDULE Adopted: 03-08-2023 Effective/Billed After: ... 04-01-2023 Applicable within the corporate limits of the City of Grand Rapids: Customer Charges Charges ...
-
Public Utilities Financial Reports
Public Utilities | Pageand Distribution 72 Water Distribution by Customer Class 73 Number of Water and Wastewater Collection ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ... in over a decade. In 2019, when GRPUC conducted the electric utility study, the AMI and AMR water ...
-
Residential Utility Service Application
Public Utilities | Pageoffice to create an account for the applicant(s), within one week of connection, or services may be ... provided to law enforcement personnel if requested by them. In accordance with MN Statutes Sections 13.03 ... and 13.04, I acknowledge by signing this application form that I have been informed of and understand ...
-
Permit Fee Calculator
Community Development | PageCalculator Sort A to Z ryans_permit_fee_calculator_2010.xlsx Sheet1 BUILDING PERMIT FEE CALCULATOR Mar-04 ... $50,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee $30,000.00 $442.65 $287.72 ... plan review 25% plan review fee: $1,954.04 $15,178.89 $3,000,001.00- $4,000,000.00 Project Cost Permit ...
-
2023 Rural Electric Service Rate Schedule
Public Utilities | PageEffective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ... 05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ...
-
2023 City Electric Interim Annexation Areas Service Rate Schedule
Public Utilities | Page12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ...
-
City Council Regular Meeting
City Council | Calendar Event | 06/25/12 04:00pmalterations shall be made to the hangar without written consent of Lessor. 7.2) No signs or advertising matter ... is exposed pursuant to Minnesota Statutes Section 466.04 and subsequent amendments thereto. 11) ...
-
Distributed Energy Resources
Public Utilities | PageRapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...