Page not found

Search results

  1. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ... 11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ...

  2. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 $20.00 $25.00 $35.00 $50.00 Commodity ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    to 22.9 kV for distribution to 6 major substations, 5 rural step-down stations, or directly ... transformed to consumer applicable voltages. The main 115 kV to 22.9 kV substation was constructed in 2005 at ... a cost of $2.3 million dollars, and financed through reserves. The Tioga 115 kV to 22.9 kV substation was ...

  4. 2023 City Water Rates

    Public Utilities | Page

    Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... Gallons Next 22,000 Gallons All Gallons Over 30,000 City Commercial First 40,000 Gallons Next 360,000 ... $11.01 $3.94 $4.87 $6.22 $3.76 $4.64 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: ...

  5. 2023 Electric Security Light Rates

    Public Utilities | Page

    – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ... 01/01/2023 Last Revised: Adopted 12/15/2021 Adopted 02/17/2021 Effective 04/01/2022 Effective 02 ... /17/2021 Adopted 12/18/2019 Effective 09/01/2020 Table 1 ...

  6. 2022 Cost of Service Studies

    Public Utilities | Page

    contract with MP which became effective 1/1/22 has a significant impact on the overall results. An overall ... center. The combined capital improvements for the electric utility are shown in Table 2-2 below. Projected ... Operating Results – Existing Rates- 5- Table 2-2 Capital Improvements Capital Item 2022 2023 2024 2025 2026 ...

  7. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Simplified Process (under 20kW capacity)  c. Fast Track Process (see applicability within)  d. Study Process (see applicability within)  2. ...  .......................................................................................................................... 2  2.2.  DER ...

  8. Permit Fee Calculator

    Community Development | Page

    $0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... $800.00 $34.25 $22.26 $0.40 $56.91 $2,001.00- $25,000.00 Project Cost Permit Fee Plan Review Fee State ... Permit Fee Plan Review Fee State Surcharge Total Fee $100,000.00 $1,005.20 $653.38 $50.00 $1,708.58 ...

  9. Sales Tax Fact Sheet

    Administration | Page

    10/1/2019 Note: The following cities also have a $20 vehicle excise tax on sales of motor vehicles made by ... for lease. Vehicle Excise Tax A $20 vehicle excise tax applies to sales of motor vehicles in the ... County 10/1/2017 Goodhue County 1/1/2019 Hennepin County 10/1/2017 Kandiyohi County 4/1/2018 Otter Tail ...

  10. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    Blandin Beach House Demo 20 Blandin Beach Restrooms 21 Blandin Beach Pavilion 22 New Fire Hall/Police Evidence 23 Building ... 106 CP 2019‐2, GR/Cohasset Connection Trail Phase 2 107 Year Project Starts: 2024 ... improvements described in the capital improvement plan. 1.02. Before the approval of the capital improvement ...

Pages