Page not found

Search results

  1. 2023 City Water Rates

    Public Utilities | Page

    $11.01 $3.94 $4.87 $6.22 $3.76 $4.64 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: ... Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... Effective/Billed After: 01-01-2023 Applicable within the corporate limits of the City of Grand Rapids: Customer ...

  2. 2023 Electric Security Light Rates

    Public Utilities | Page

    Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    House – Schedule of Expenses 53 Sludge Disposal – Schedule of Expenses 54 Secondary Treatment Facility ... to 22.9 kV for distribution to 6 major substations, 5 rural step-down stations, or directly ... transformed to consumer applicable voltages. The main 115 kV to 22.9 kV substation was constructed in 2005 at ...

  4. Basic Wood Framing

    Community Development | Page

    (1) 2-2X8 9-1 (1) 5-4 (1) 5-0 (2) 4-9 (2) 2-2X10 7-0 (2) 6-7 (2) 6-1 (2) 5-9 (2) 2-2X12 8-1 (2) 7-7 ... (JACK STUDS) One floor only 2-2X4 3-1 (1) 2-11 (1) 2-8 (1) 2-7 (1) 2-2X6 4-6 (1) 4-3 (1) 3-11 (1) 3-9 ... 9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ...

  5. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... Effective/Billed After: 01-01-2023 Applicable within the corporate limits of the City of Grand Rapids: Customer ...

  6. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ... 05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... All kWh/mo@ $0.1111/kWh All kWh/mo @ $0.0557/kWh Demand: All kW@ $17.64/kW 12/14/2022 01/01 ...

  7. 2022 Cost of Service Studies

    Public Utilities | Page

    contract with MP which became effective 1/1/22 has a significant impact on the overall results. An overall ... approximately 5.4% from 2022. There are some additional small changes recommended for certain rates as detailed ... center. The combined capital improvements for the electric utility are shown in Table 2-2 below. Projected ...

  8. Decks

    Community Development | Page

    Redwood, Ponderosa Pine 2-2X6 5’5” 4’8” 4’2” 3’10” 3’6” 3’1” 2’9” 2-2X8 6’10” 5’11” 5’4” 4’10” 4’6” 4’1” ... 2- 12d nails are recommended on nominal 2-inch decking. 10d nails are recommended for 5/4 ... of 24 inches. Radius-edged Patio Decking (5/4 decking) has been specifically developed for outdoor ...

  9. 2023 City Electric Interim Annexation Areas Service Rate Schedule

    Public Utilities | Page

    12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ... @ $0.1227/kWh 12/14/2022 01/01/2023 Minimum Bill Customer Charge Customer Charge PURCHASED POWER ADJUSTMENT ... Effective 05/01/2021 ...

  10. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    Blandin Beach House Demo 20 Blandin Beach Restrooms 21 Blandin Beach Pavilion 22 New Fire Hall/Police Evidence 23 Building ... Carpet Replacement‐Third Floor 28 Library Upgrades 29‐34 Carpet Replacement‐Council Chambers 35 Central School Upgrades 36‐54 ... 106 CP 2019‐2, GR/Cohasset Connection Trail Phase 2 107 Year Project Starts: 2024 ...

Pages