Page not found

Search results

  1. Basic Wood Framing

    Community Development | Page

    material on edge 2X Bottom plate 2X studs 16” or 24” O.C. 2X Double top plate 2 TABLE R602.3(5) SIZE, ... Laterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24c 16 ... c — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    Information 38 – 41 Supplementary Information 2022 Combining Schedules of Revenues and Expenses 42 2021 ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ... in over a decade. In 2019, when GRPUC conducted the electric utility study, the AMI and AMR water ...

  3. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... Effective/Billed After: 01-01-2023 Applicable within the corporate limits of the City of Grand Rapids: Customer ...

  4. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  .......................................................................................................................... 6  4.2.  Availability ... Application to be submitted with an electronic signature.    4.2. Availability of Information  ...

  5. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ... 05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... All kWh/mo@ $0.1111/kWh All kWh/mo @ $0.0557/kWh Demand: All kW@ $17.64/kW 12/14/2022 01/01 ...

  6. Garages: One Story

    Community Development | Page

    finished grade. WALL CONSTRUCTION Walls may be framed with minimum No. 3 grade studs spaced 16 or 24 inches ... on center. Utility grade studs may be used when supporting only a roof, spaced not more than 16 ... than 5/16 inch for 16-inch stud spacing and not less than 3/8 inch for 24-inch stud spacing. Sheathing ...

  7. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ... million or 16.3 percent of operating revenues. Projected Operating Results – Existing Rates- 7- Table 2-4 ...

  8. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... Beacon Relocation 13 Airfield Lighting Replacement 14 FBO Improvements 15 Airport Zoning Update 16 Buildings Five ... 106 CP 2019‐2, GR/Cohasset Connection Trail Phase 2 107 Year Project Starts: 2024 ...

  9. 2023 City Water Rates

    Public Utilities | Page

    Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... Effective/Billed After: 01-01-2023 Applicable within the corporate limits of the City of Grand Rapids: Customer ... $11.01 $3.94 $4.87 $6.22 $3.76 $4.64 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: ...

  10. City Council Regular Meeting

    City Council | Calendar Event | 05/14/12 04:00pm

    49,475 42,064 2007 Improvement Bonds 119,947 117,311 119,923 122,325 119,268 116,210 2006C Prj 2004-16 Sp ... Regular Meeting Sort A to Z citycouncil_closed_2012-05-14.pdf 01"./2(13 0"%#, ... Lake-Isleview Partial Reconditioning 201 1-6 Horseshoe Lake Road- Golf Course Road to 21 st Street S W Staff ...

Pages