Page not found

Search results

  1. 2023 Electric Security Light Rates

    Public Utilities | Page

    – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ... – Existing Pole 4200 Lumens 40 Watt LED LAMPS – Separate Pole 6600 Lumens 70 Watt LED LAMPS – Existing Pole ...

  2. 2023 City Water Rates

    Public Utilities | Page

    Gallons Next 22,000 Gallons All Gallons Over 30,000 City Commercial First 40,000 Gallons Next 360,000 ... $11.01 $3.94 $4.87 $6.22 $3.76 $4.64 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: ... Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ...

  3. Permit Fee Calculator

    Community Development | Page

    $800.00 $34.25 $22.26 $0.40 $56.91 $2,001.00- $25,000.00 Project Cost Permit Fee Plan Review Fee State ... $0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... Surcharge Total Fee $4,000.00 $98.40 $63.96 $2.00 $164.36 No Plan Review Total $100.40 $25,001.00- ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    contract with MP which became effective 1/1/22 has a significant impact on the overall results. An overall ... center. The combined capital improvements for the electric utility are shown in Table 2-2 below. Projected ... Operating Results – Existing Rates- 5- Table 2-2 Capital Improvements Capital Item 2022 2023 2024 2025 2026 ...

  5. Public Utilities Financial Reports

    Public Utilities | Page

    to 22.9 kV for distribution to 6 major substations, 5 rural step-down stations, or directly ... transformed to consumer applicable voltages. The main 115 kV to 22.9 kV substation was constructed in 2005 at ... a cost of $2.3 million dollars, and financed through reserves. The Tioga 115 kV to 22.9 kV substation was ...

  6. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    Blandin Beach House Demo 20 Blandin Beach Restrooms 21 Blandin Beach Pavilion 22 New Fire Hall/Police Evidence 23 Building ... CP 2017‐2, City Wide Overlays‐7th Ave SE 102 CP 2022‐1, Hwy 2 Lighting Replacement 103 Year Project Starts: 2023 ... improvements described in the capital improvement plan. 1.02. Before the approval of the capital improvement ...

  7. City Council Regular Meeting

    City Council | Calendar Event | 05/14/12 04:00pm

    Administrator CITYOF GRAND RAPIDS Page 1 Printed on 5H1/2012 C I TY O F G RAN D RAP I DS C40 NORTH AVE. GttANU ... City infrastructure projects in June and prioritize for the 2013-2017 C[P. Attachments: All Projects ... 125,000 City Wide Overlays-Rural 2014l2013-2 1 40,000 40,000 21st St SW (3rd Ave to Horseshoe Lk Rd) ...

  8. Maintenance Workers – Seasonal/Temporary

    Engineering / Public Works | Job Opening

    conditions.  Applicants should be available to work up to 40 hours per week, Monday – Friday, with some ...

  9. Kill A Watt Meter

    Grand Rapids Area Library | Page

    a 2-week loan from the library at 140 NE 2nd Street, Grand Rapids. To reserve a Kill A Watt meter, call the ... cumulative kilowatt-hours of energy usage, and displays volts, amps, and watts at a 0.2% accuracy rating. ...

  10. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ... 11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ...

Pages