Page not found

Search results

  1. 2023 Electric Security Light Rates

    Public Utilities | Page

    $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ... – Existing Pole 4200 Lumens 40 Watt LED LAMPS – Separate Pole 6600 Lumens 70 Watt LED LAMPS – Existing Pole ... and replacement fixtures will be either 40 or 70 watt LED lamps. All other fixture types shall be ...

  2. Permit Fee Calculator

    Community Development | Page

    $0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... $800.00 $34.25 $22.26 $0.40 $56.91 $2,001.00- $25,000.00 Project Cost Permit Fee Plan Review Fee State ... Surcharge Total Fee $4,000.00 $98.40 $63.96 $2.00 $164.36 No Plan Review Total $100.40 $25,001.00- ...

  3. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    2 1 2,775,7931,794,685 981,108Trails Total Urban Street 2022/2017-2 945,000945,0007th Ave SE- overlay 1 2023/2003-18 ... Year Plan Summary 17 IRA Civic Center Improvements 18 Forest Lake/YMCA Outdoor Rink 19 ... CP 2017‐2, City Wide Overlays‐7th Ave SE 102 CP 2022‐1, Hwy 2 Lighting Replacement 103 Year Project Starts: 2023 ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    2027 Operating Revenues $19,061,765 $18,448,198 $18,977,138 $19,515,558 $20,064,303 $20,624,106 Less ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ... projected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ...

  5. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 02/08/18 04:00pm

    18 (with council term) Rick Blake— 12/ 31/ 18 (with council term) Mike Prcytarski — 3/ 1/ 21 Cory ... Jackson — 3/ 1/ 23 Mike Stefan- 3/ 1/ 18 Chris Lynch — 3/ 1/ 19 Sholom Blake — 3/ 1/ 19 GRAND RAPIDS ... 2017 REGULAR MEETING. The foil in favor thereof: S. Blake, Christy, Jackson, Stefan. Opposed: None, ...

  6. Special Assessments

    Engineering / Public Works | Page

    owners shall be assed at a 40% rate for those items that typically exist prior to the improvement. ... Developments 100% • Developed Areas 40% Areas where sidewalks are installed on only one side of the street and ... infrastructure is replaced, rehabilitated or maintained. • Sanitary Sewer/Water Mains Forty percent (40%) of the ...

  7. Public Utilities Financial Reports

    Public Utilities | Page

    effluent per day; 4.0 million gallons from UPM/Blandin Paper Company and 1.5 million gallons from domestic ... (cont.)  Realign tasks for information systems which focus internally on exporting data from current and ... customer wastewater by the GRPUC.  Total operating expenses decreased by $625,838, or 2.40%, over the ...

  8. Data Request

    Police | Page

    Data not on Individuals Meaning of Classification Public MS §13.02, subd. 15 Public MS §13.02, subd. 15 ... Public MS §13.02, subd. 4 Available to anyone for any reason Private MS §13.02, subd. 12 Private MS ... §13.10, subd. 1B Nonpublic MS §13.02, subd. 9 Available only to the data subject and to anyone authorized ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 05/14/12 04:00pm

    Administrator CITYOF GRAND RAPIDS Page 1 Printed on 5H1/2012 C I TY O F G RAN D RAP I DS C40 NORTH AVE. GttANU ... City infrastructure projects in June and prioritize for the 2013-2017 C[P. Attachments: All Projects ... 125,000 City Wide Overlays-Rural 2014l2013-2 1 40,000 40,000 21st St SW (3rd Ave to Horseshoe Lk Rd) ...

  10. The Value of Trees

    Public Utilities | Page

    of oxygen. This is enough to meet the annual needs of 18 people."—U.S. Department of Agriculture ... planting through local newspaper articles appeared on Arbor Day to wrap trunks, water, mulch, and stake 40 ... of the tree (but not touching the trunk). Water the tree generously every week or 10 days during the ...

Pages