Page not found

Search results

  1. 2023 City Water Rates

    Public Utilities | Page

    Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... 2023 City Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact Info Block Web ... GRAND RAPIDS PUBLIC UTILITIES COMMISSION CITY WATER SERVICE RATE SCHEDULE Adopted: 12 ...

  2. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 02/08/18 04:00pm

    Rehabilitation Project Status b. Rebound Hospitality LOI C. Adjourn GREDA Members/terms: Dale Christy — 12/ 31/ ... 18 (with council term) Rick Blake— 12/ 31/ 18 (with council term) Mike Prcytarski — 3/ 1/ 21 Cory ... 2017 REGULAR MEETING. The foil in favor thereof: S. Blake, Christy, Jackson, Stefan. Opposed: None, ...

  3. Capital Improvements: Street Reconstruction Plan

    Engineering / Public Works | Page

    2017-2021 to identify potential street reconstruction projects and their funding sources. The Plan is ... included for the years 2017-2021 are proposed projects and will be evaluated during budget cycles. In light ... Utilities (1st Street SW, 12th Avenue SW, 11th Avenue SW and 10th Avenue SW) City Project 2015-1 January 9, ...

  4. ADA (Americans with Disabilities Act) Transition Plan

    Engineering / Public Works | Page

    .............................................................................................................................. 12 Building Facilities ... ...................................................................................................................... 12 Park Facilities ... ............................................................................................................................ 12 Public Outreach ...

  5. Footings, Foundations & Slabs

    Community Development | Page

    extend 12 inches below undisturbed ground (R403.1.4) The top surface of footings must be level. The ... Conventional light-frame construction 1-story 12 12 12 2-story 15 12 12 3-story 23 17 12 4-inch brick veneer ... over light frame or 8-inch hollow concrete masonry 1-story 12 12 12 2-story 21 16 12 3-story 32 24 16- ...

  6. Data Request

    Police | Page

    Public MS §13.02, subd. 4 Available to anyone for any reason Private MS §13.02, subd. 12 Private MS ... $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ... x 12" Photo Prints $10.00 base plus $0.25/photo Photo Copy-material provided by person making request  ...

  7. Library Board Meeting

    Grand Rapids Area Library Board | Calendar Event | 06/08/22 05:00pm

    kgibeau@ci.grand-rapids.mn.us b52b0a1b-d7a4-4eb2-8154-e48fa2450e02 Sort A to Z Agenda (HTML) Agenda Packet (HTML) ...

  8. Public Utilities Financial Reports

    Public Utilities | Page

    Collection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... iron distribution mains consisting mostly of 6”, 8” and 12” pipe. The GRPUC is responsible for the ...  Replace aged water treatment plant turbidity meters.  Replace 12 bad sections of wastewater collection ...

  9. 2022 Cost of Service Studies

    Public Utilities | Page

    Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ... /14/2022 Wastewater Cost of Service Study- Adopted 12/14/2022 Image Slideshow Display Contact Info Block Web Page Menu ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ...

  10. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    /15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 2023 Wastewater Collection & Treatment Rate Schedule- City- Adopted 12/14/2022 2023 Wastewater ...

Pages