Page not found

Search results

  1. Basic Wood Framing

    Community Development | Page

    1-9 (1) 2-2X6 3-2 (2) 3-0 (2) 2-9 (2) 2-7 (2) 2-2X8 4-1 (2) 3-10 (2) 3-6 (2) 3-4 (2) 2-2X10 4-11 (2) ... (JACK STUDS) One floor only 2-2X4 3-1 (1) 2-11 (1) 2-8 (1) 2-7 (1) 2-2X6 4-6 (1) 4-3 (1) 3-11 (1) 3-9 ... 9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ...

  2. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ... Z 2023_wm_calender.pdf S M T W TH F S S M T W TH F S S M T W TH F S 1 2 3 4 1 2 3 4 1 2 3 4 5 6 7 5 6 7 8 9 10 11 ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    Information 38 – 41 Supplementary Information 2022 Combining Schedules of Revenues and Expenses 42 2021 ... to 22.9 kV for distribution to 6 major substations, 5 rural step-down stations, or directly ... transformed to consumer applicable voltages. The main 115 kV to 22.9 kV substation was constructed in 2005 at ...

  4. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ...

  5. Financial Reports

    Finance | Page

    Transmittal 3 Certificate of Achievement 9 Principal City Officials and Department Heads 11 Organization Chart ... Statement 4 41 Reconciliation of the Statement of Revenues, Expenditures and Changes in Fund Balances of ... General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ...

  6. City Council Regular Meeting

    City Council | Calendar Event | 05/14/12 04:00pm

    2016 Capital Improvement Plan. Attachments: 2012-2016 Infrastructure Proiects bv Funding Source ... 2012-2016 Proiects & Fundin4 Source bv Deaartment 2012-2016 Levv Comparison-Infrastructure Proiects 2• ... i`iaiiuS SN°° Legislation Details (With Text) File #: 12-0222 Version: 1 Name: Discuss 2012-2016 Capital ...

  7. 2022 Cost of Service Studies

    Public Utilities | Page

    19,505 20,090 Seminar/training 41,493 12,554 12,617 11,590 11,401 12,000 12,600 12,978 13,367 13,768 ... contract with MP which became effective 1/1/22 has a significant impact on the overall results. An overall ... center. The combined capital improvements for the electric utility are shown in Table 2-2 below. Projected ...

  8. Decks

    Community Development | Page

    8’ 10’ 12’ 14’ 16’ 18’ Southern Pine 2-2X6 7’1” 6’2” 5’6” 5’0” 4’8” 4’4” 4’12-2X8 9’2” 7’11” 7’1” ... Redwood, Ponderosa Pine 2-2X6 5’5” 4’8” 4’2” 3’10” 3’6” 3’1” 2’9” 2-2X8 6’10” 5’11” 5’4” 4’10” 4’6” 4’1 ... 22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ...

  9. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 04/26/18 04:00pm

    Recorder GREDA Regular Meeting Thursday, March 22, 2018 a DATE: 04/ 18/ 2018 TIME: 11: 17: 19 ID: AP443000. ... minutes from the March 22, 2018 regular meeting. 5. Consider approval of claims 6. Consider approval of ... Sawmill Inn site. 10. Updates: a. 11. Adjourn GREDA Members/ terms: Dale Christy— 12/ 31/ 18 (with council ...

  10. Garages: One Story

    Community Development | Page

    (at least 1/8” = 1 ft. min.). They may be on 8 ½ X 11 paper. Plans must include a site plan, floor ... to have a 4:1 aspect ratio. For narrower wall segments, see page 6 of this handout. ROOF TRUSSES Wood ... Span Header Size # Jack Studs Span Heade r Size # Jack Studs 2-10 2-2X4 1 2-6 2-2X4 1 2-3 2-2X6 1 4-2 ...

Pages