Page not found
Search results
-
2023 City Multi-Family Water Rate Schedule
Public Utilities | Page150 over 150 6 $5.71 $3.99 $38.25 0 24 25 48 49 180 over 180 7 $5.71 $3.99 $43.96 0 28 29 56 57 210 ... 12 $5.71 $3.99 $72.51 0 48 49 96 97 360 over 360 13 $5.71 $3.99 $78.22 0 52 53 104 105 390 over 390 ... 9/12/2018 Effective 2/1/2022 10/1/2018 5/11/2022 9/12/2018 5/11/20224/21/2022 Revised Adopted ...
-
Complete Application Packet: Off-sale
Administration | PageBackground Check form Fillable PDF 4. MN Worker's Comp Fillable PDF Check Box11: Check Box12: Check ... Please fill in the following information and return this form along with your application to the agency ... issuing the license. Do not return this form to the department of revenue. Please print or ...
-
Data Request
Police | PageSingle-Family $8.00 $8.50 $8.75 Multi-Family $29.24 $31.07 $31.98 Commercial $44.78 $47.58 $48.98 Industrial ... Police Department, may submit the completed form below. Occasionally, there will be fees associated with ... $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ...
-
Decks
Community Development | Page12” 34” 2X8 16” 29” 2X10 12” 49” 2X10 16” 42” 2X10 24” 34” 2X12 16” 57” 2X12 24” 47” Joists must bear ... 8’ 10’ 12’ 14’ 16’ 18’ Southern Pine 2-2X6 7’1” 6’2” 5’6” 5’0” 4’8” 4’4” 4’1” 2-2X8 9’2” 7’11” 7’1” ... Redwood, Ponderosa Pine 2-2X6 5’5” 4’8” 4’2” 3’10” 3’6” 3’1” 2’9” 2-2X8 6’10” 5’11” 5’4” 4’10” 4’6” 4’1” ...
-
Complete 3.2 Beer Application
Administration | Pagefill in the following information and return this form along with your application to the agency ... issuing the license. Do not return this form to the department of revenue. Please print or ... this form ...
-
Basic Wood Framing
Community Development | Page2 5-2 2 4-8 2 3-2×10 7-3 2 6-4 2 5-8 2 3-2×12 8-5 2 7-4 2 6-7 2 4-2×8 6-10 1 6-0 2 5-5 2 4-2×10 8-4 ... 1 2-2×6 3-6 2 3-1 2 2-9 2 2-2×8 4-6 2 3-11 2 3-6 2 2-2×10 5-6 2 4-9 2 4-3 2 2-2×12 6-4 2 5-6 3 5-0 3 3-2×8 ... 3 4-7 3 4-1 4 3-2×8 4-8 2 4-1 2 3-8 2 3-2×10 5-9 2 4-11 2 4-5 3 3-2×12 6-8 2 5-9 2 5-2 3 4-2×8 5-5 2 4-8 ...
-
ADA (Americans with Disabilities Act) Transition Plan
Engineering / Public Works | PageTransition Plan was held at 5:30, on March 12, 2018, at the regularly scheduled City Council meeting. There ... website from February 12, 2018 to March 12, 2018 for review and comment. City staff did not receive any ... Appendix C – Public Outreach Public Hearing on the ADA Transition Plan was held at 5:30, on March 12, 2018 ...
-
Footings, Foundations & Slabs
Community Development | Pageprotected shallow foundations Insulating concrete form foundation walls SITE AND SOILS The area around any ... extend 12 inches below undisturbed ground (R403.1.4) The top surface of footings must be level. The ... Conventional light-frame construction 1-story 12 12 12 2-story 15 12 12 3-story 23 17 12 4-inch brick veneer ...
-
Public Utilities Financial Reports
Public Utilities | PageCollection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... constructed in 2018 for $1.4 million dollars. The electrical distribution system consists of 157 overhead and ... iron distribution mains consisting mostly of 6”, 8” and 12” pipe. The GRPUC is responsible for the ...
-
Financial Reports
Finance | PageGeneral Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ... Central School Statement 28 145 Airport Operations Statement 29 146 IRA Civic Center Statement 30 147 ... Activities Debt Table 12 180 Demographic and Economic Information: Legal Debt Margin Information Table 13 181 ...