Page not found

Search results

  1. Footings, Foundations & Slabs

    Community Development | Page

    over light frame or 8-inch hollow concrete masonry 1-story 12 12 12 2-story 21 16 12 3-story 32 24 16- ... apart and within 12 inches of but not less than seven bolt diameters from each end. Walls less than 24 ... @ 48” #5 @ 48” #6 @ 48” #6 @ 40” #6 @ 24” #4 @ 56” #4 @ 56” #5 @ 56” #6 @ 56” #6 @ 32” #4 @ 72” #4 @ 72” ...

  2. Data Request

    Police | Page

    Single-Family $8.00 $8.50 $8.75 Multi-Family $29.24 $31.07 $31.98 Commercial $44.78 $47.58 $48.98 Industrial ... $44.78 $47.58 $48.98 Institutional $39.72 $42.20 $43.44 City Map $10.00 Prints: 24/24 $3.50 each 24 ... Police Department, may submit the completed form below.  Occasionally, there will be fees associated with ...

  3. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    150 over 150 6 $5.71 $3.99 $38.25 0 24 25 48 49 180 over 180 7 $5.71 $3.99 $43.96 0 28 29 56 57 210 ... 12 $5.71 $3.99 $72.51 0 48 49 96 97 360 over 360 13 $5.71 $3.99 $78.22 0 52 53 104 105 390 over 390 ... 9/12/2018 Effective 2/1/2022 10/1/2018 5/11/2022 9/12/2018 5/11/20224/21/2022 Revised Adopted ...

  4. Garages: One Story

    Community Development | Page

    12’10” SPF 5’8” 8’5” 10’8” 13’1” 24” o.c. Hem Fir 4’8” 6’9” 8’7” 10’6” SPF 4’8” 6’11” 8’9” 10’8” ... finished grade. WALL CONSTRUCTION Walls may be framed with minimum No. 3 grade studs spaced 16 or 24 inches ... than 5/16 inch for 16-inch stud spacing and not less than 3/8 inch for 24-inch stud spacing. Sheathing ...

  5. Complete Application Packet: Off-sale

    Administration | Page

    Background Check form Fillable PDF 4. MN Worker's Comp Fillable PDF Check Box11: Check Box12: Check ... Please fill in the following information and return this form along with your application to the agency ... issuing the license. Do not return this form to the department of revenue. Please print or ...

  6. Basic Wood Framing

    Community Development | Page

    19.2” O.C. 8-9 11-6 14-1 16-3 24” O.C. 8-1 10-3 12-7 14-7 GIRDER SPANS AND HEADER SPANS FOR EXTERIOR ... 2 5-2 2 4-8 2 3-2×10 7-3 2 6-4 2 5-8 2 3-2×12 8-5 2 7-4 2 6-7 2 4-2×8 6-10 1 6-0 2 5-5 2 4-2×10 8-4 ... 7-11 2 6-11 2 6-2 2 4-2×12 9-2 2 8-0 2 7-2 2 Roof, ceiling and two center- bearing floors 2-2×4 2-4 ...

  7. Decks

    Community Development | Page

    22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... CEDAR JOIST 12” oc 16”oc 24”oc 12” oc 16”oc 24”oc 2X6 10’9” 9’9” 8’6” 9’2” 8’4” 7’3” 2X8 14’2” 12 ... 12” 34” 2X8 16” 29” 2X10 12” 49” 2X10 16” 42” 2X10 24” 34” 2X12 16” 57” 2X12 24” 47” Joists must bear ...

  8. Public Utilities Financial Reports

    Public Utilities | Page

    contract revenues 24,100 26,124 38,351 (2,024) (12,227) Payment in lieu of taxes (870,377) (882,288) ... Collection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... constructed in 2018 for $1.4 million dollars. The electrical distribution system consists of 157 overhead and ...

  9. Complete 3.2 Beer Application

    Administration | Page

    fill in the following information and return this form along with your application to the agency ... issuing the license. Do not return this form to the department of revenue. Please print or ... this form ...

  10. ADA (Americans with Disabilities Act) Transition Plan

    Engineering / Public Works | Page

    Transition Plan was held at 5:30, on March 12, 2018, at the regularly scheduled City Council meeting. There ... website from February 12, 2018 to March 12, 2018 for review and comment. City staff did not receive any ... Appendix C – Public Outreach Public Hearing on the ADA Transition Plan was held at 5:30, on March 12, 2018 ...

Pages