Page not found

Search results

  1. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    9/12/2018 Effective 2/1/2022 10/1/2018 5/11/2022 9/12/2018 5/11/20224/21/2022 Revised Adopted ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 12 $5.71 $3.99 $72.51 0 48 49 96 97 360 over 360 13 $5.71 $3.99 $78.22 0 52 53 104 105 390 over 390 ...

  2. Data Request

    Police | Page

    Police Department, may submit the completed form below.  Occasionally, there will be fees associated with ... $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ... x 12" Photo Prints $10.00 base plus $0.25/photo Photo Copy-material provided by person making request  ...

  3. Complete Application Packet: Off-sale

    Administration | Page

    Background Check form Fillable PDF 4. MN Worker's Comp Fillable PDF Check Box11: Check Box12: Check ... Check Box37: Check Box38: 1: 2: 3: 4: 5: 6: 7: 8: 9: 10: 11: 12: 13: 14: 15: 16: 17: 18: 19: 20: 21: 22: ... Please fill in the following information and return this form along with your application to the agency ...

  4. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 02/08/18 04:00pm

    18 (with council term) Rick Blake— 12/ 31/ 18 (with council term) Mike Prcytarski — 3/ 1/ 21 Cory ... Meeting with Agenda and Minutes Thursday, February 8, 2018- 4:00pm greda_20180208.pdf Image ... February 8, 2018 4: 00pm Grand Rapids City Hall NOTICE IS HEREBY GIVEN, that a regular meeting of the Grand ...

  5. Decks

    Community Development | Page

    ’10” 11’0” 12’1” 11’0” 9’2” 2X10 18’0” 16’1” 13’5” 15’5” 13’9” 11’3” 2X12 21’9” 19’0” 15’4” 18’5” 16’0” 13’0” ... 15’10” 13’5” 14’11” 13’0” 10’7” 2X12 21’2” 18’10” 15’5” 17’5” 15’1” 12’4” BEAM SPANS (Wet Service) ... 8’ 10’ 12’ 14’ 16’ 18’ Southern Pine 2-2X6 7’1” 6’2” 5’6” 5’0” 4’8” 4’4” 4’1” 2-2X8 9’2” 7’11” 7’1” ...

  6. Footings, Foundations & Slabs

    Community Development | Page

    over light frame or 8-inch hollow concrete masonry 1-story 12 12 12 2-story 21 16 12 3-story 32 24 16- ... protected shallow foundations  Insulating concrete form foundation walls SITE AND SOILS The area around any ... extend 12 inches below undisturbed ground (R403.1.4) The top surface of footings must be level. The ...

  7. Complete 3.2 Beer Application

    Administration | Page

    fill in the following information and return this form along with your application to the agency ... issuing the license. Do not return this form to the department of revenue. Please print or ... this form ...

  8. Public Utilities Financial Reports

    Public Utilities | Page

    Collection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... constructed in 2018 for $1.4 million dollars. The electrical distribution system consists of 157 overhead and ... iron distribution mains consisting mostly of 6”, 8” and 12” pipe. The GRPUC is responsible for the ...

  9. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 29,400 30,282 31,190 32,126 33,090 Safety 21,887 18,731 12,098 29,396 30,613 17,000 17,850 18,386 18,937 ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ...

  10. Basic Wood Framing

    Community Development | Page

    2 5-2 2 4-8 2 3-2×10 7-3 2 6-4 2 5-8 2 3-2×12 8-5 2 7-4 2 6-7 2 4-2×8 6-10 1 6-0 2 5-5 2 4-2×10 8-4 ... 2 7-4 2 6-7 2 4-2×12 9-8 2 8-6 2 7-7 2 Roof, ceiling and one clear span floor 2-2×4 2-5 1 2-1 1 1-10 ... 3 4-7 3 4-1 4 3-2×8 4-8 2 4-1 2 3-8 2 3-2×10 5-9 2 4-11 2 4-5 3 3-2×12 6-8 2 5-9 2 5-2 3 4-2×8 5-5 2 4-8 ...

Pages