Page not found

Search results

  1. Public Information Requests

    Administration | Page

    (218)326-7608 Fax www.cityofgrandrapidsmn.com Public Information Request Form A. Completed by requestor. If ... necessary) B. Signature. (If form is mailed and includes a request for data that is not public, sign this ... form and have your signature notarized. Signed: Acknowledged before me this_________________ day ...

  2. Data Request

    Police | Page

    Police Department, may submit the completed form below.  Occasionally, there will be fees associated with ...   * Not subject to the $20.00 excess rule. $1.00 1st Page- $0.10 each additional page   Data Request Form ... Web Page Links Menu Settings Page Categories Data Request Sort A to Z data_request_form.pdf 420 N. ...

  3. 2023 City Water Rates

    Public Utilities | Page

    Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... Gallons Next 22,000 Gallons All Gallons Over 30,000 City Commercial First 40,000 Gallons Next 360,000 ... $11.01 $3.94 $4.87 $6.22 $3.76 $4.64 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: ...

  4. Garages: One Story

    Community Development | Page

    Span Header Size # Jack Studs Span Heade r Size # Jack Studs 2-10 2-2X4 1 2-6 2-2X4 1 2-3 2-2X6 1 4-2 ... a garage are:  Footing and foundation inspections after form work and reinforcement is in place but prior ... 2-2X6 1 3-8 2-2X6 1 3-3 2-2X6 1 5-4 2-2X8 2 5-7 2-2X10 2 5-0 2-2X10 2 6-6 2-2X10 2 6-6 2-2X12 2 5-10 ...

  5. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 12 $5.71 $3.99 $72.51 0 48 49 96 97 360 over 360 13 $5.71 $3.99 $78.22 0 52 53 104 105 390 over 390 ... over 630 22 $5.71 $3.99 $129.61 0 88 89 176 177 660 over 660 23 $5.71 $3.99 $135.32 0 92 93 184 185 690 ...

  6. Public Utilities Financial Reports

    Public Utilities | Page

    Information 38 – 41 Supplementary Information 2022 Combining Schedules of Revenues and Expenses 42 2021 ... to 22.9 kV for distribution to 6 major substations, 5 rural step-down stations, or directly ... transformed to consumer applicable voltages. The main 115 kV to 22.9 kV substation was constructed in 2005 at ...

  7. Complete Application Packet: Off-sale

    Administration | Page

    Please fill in the following information and return this form along with your application to the agency ... issuing the license. Do not return this form to the department of revenue. Please print or ... this form ...

  8. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    Blandin Beach House Demo 20 Blandin Beach Restrooms 21 Blandin Beach Pavilion 22 New Fire Hall/Police Evidence 23 Building ... CP 2003‐18, 21st St SW (3rd Ave ‐ Horseshoe Lk Rd 104 CP 2016‐1, 6th Ave (4‐5th St) NW Street Reconstruction 105 CP 2018 ... CP 2015‐1, City Wide Overlays‐Sylvan 111 CP 2018‐3, 10th St NE (3rd Ave to CDS) 112 CP 2018‐4, 11th St NE (2nd Ave to 3rd Ave) 113 ...

  9. Basic Wood Framing

    Community Development | Page

    9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ... 4-7 (2) 4-3 (2) 4-1 (3) 2-2X12 5-9 (2) 5-5 (3) 5-0 (3) 4-9 (3) 3-2X8 5-1 (2) 4-9 (2) 4-5 (2) 4-2 (2) ... (JACK STUDS) One floor only 2-2X4 3-1 (1) 2-11 (1) 2-8 (1) 2-7 (1) 2-2X6 4-6 (1) 4-3 (1) 3-11 (1) 3-9 ...

  10. Decks

    Community Development | Page

    Redwood, Ponderosa Pine 2-2X6 5’5” 4’8” 4’2” 3’10” 3’6” 3’1” 2’9” 2-2X8 6’10” 5’11” 5’4” 4’10” 4’6” 4’1” ... 22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... 7’ 8’ 9’ 10’ 11’ 12’ 13’ 14’ 6” 2-2X6 2-2X6 2-2X6 2-2X6 2-2X6 2-2X6 2-2X8 2-2X8 2-2X10 2-2X10 2-2 ...

Pages