  1. 2022 Cost of Service Studies

    Public Utilities | Page

    Requirement 11,444,987$ 1,982,838$ 2,356,067$ 7,106,082$ page 3 of 3 Exhibit 3-C 2021 Customer REVENUE ... examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ...

  2. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28 ... shall be added to from the monthly electric service billing, a Purchased Power Adjustment or PPA ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ...

  3. 2023 City Water Rates

    Public Utilities | Page

    Charges Charges calculated are per month Meter Size 5/8"-3/4" 1" 1 ¼" 1 ½" ... 2" 3" 4" 6" Commodity Charges Rate $9.90 $13.80 $15.85 $17.76 $28.70 $108.70 $138.27 ... $207.48 Charges calculated are per 1000 gallons per month City Residential First 4,000 Gallons Next 4,000 ...

  4. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ...

  5. 2023 Electric Security Light Rates

    Public Utilities | Page

    Z 2023_electric_security_light_rate_schedule.pdf Rate per Lamp Per Month GRAND RAPIDS PUBLIC UTILITIES COMMISSION Adopted 12/14/2022 ... – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ...

  6. 2023 City Electric Service Rate Schedule

    Public Utilities | Page

    LIGHTING INDUSTRIAL $ $ $ $ $ Customer Charge (per month) 10.40 19.55 28.00 12.75 12.50 Adopted: ... PURCHASED POWER ADJUSTMENT (PPA) CLAUSE There shall be added to from the monthly electric service billing, ... Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 ...

  7. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    CP 2021‐2, 5th St SW (10th Ave ‐ 11th Ave) 100 CP 2021‐3, Industrial Park Utility Extention 101 Year Project Starts: 2022 ... 1 2021/P&R-1 10,977,00010,977,000IRA Civic Center Improvements 1 2021/P&R-2 40,98440,984Forest Lake/YMCA ... 2021 2025thru Total2021 2022 2023 2024 2025 Category Source Airport Improvements 39,7501,750 28 ...

  8. Financial Reports

    Finance | Page

    of 24.40 square 3 miles and serves a population of 11,126. The City of Grand Rapids signed an ... Categories Financial Reports Sort A to Z city_of_grand_rapids_-_2021_final_issued_acfr.pdf ANNUAL ... COMPREHENSIVE FINANCIAL REPORT OF THE CITY OF GRAND RAPIDS, MINNESOTA For The Year Ended December 31, 2021 ...

  9. 2023 Load Management Electric Service Rate Schedule

    Public Utilities | Page

    8.40 8.40 8.40 (9.83) (9.83) (19.73) Adopted: Effective: Billed After: Energy Charge Monthly Credit ... Monthly Credit o�3 Ton Air G:onditi0ning Unit Monthly G:redit 4-6 Ton Air €onditio.ning Unit ... $ $ $ $ $ $ '$ $ 2023 LOAD MANAGEMENT ELECTRIC SERVICE RATE SCHEDULE customer Charge (per month) (5.00) (2.50) ...

  10. Distributed Energy Resources

    Public Utilities | Page

    a. Uniform Contract (under 40kW capacity)  b. ... Municipal Minnesota Interconnection Agreement (over 40kW or upon customer request)  c. Certificate of Completion      Detroit Lakes Public Utility’s 29.3 kW Select Solar  ...  Terminology .................................................................................................................. 2  1.1.  Distributed ...