Page not found

Search results

  1. Utility Information

    Engineering / Public Works | Page

    . Commercial $48.98 per acre per month. Industrial $48.98 per acre per month. Institutional $43.44 per acre per month ... Practices Credit Policy (As per Section 70-203(b) of Ordinance No. 17-05-03) Background On May 8, 2017, the ... Grand Rapids City Council approved a Stormwater Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, ...

  2. Stormwater Credits Policy

    Engineering / Public Works | Page

    Ordinance No. 17-05-03) Background On May 8, 2017, the Grand Rapids City Council approved a Stormwater ... Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... a determination of the credit once per calendar year. If the credit is approved, the credit will be applied within ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    Operator 2021-12-03 Organizational Chart Maintenance III xii FINANCIAL SECTION xiii Independent ... debt outstanding.  Total operating revenues increased $1,375,694, or 5.43%, between 2021 and 2022. ... $1,375,694, or 5.43% from 2021. Electric revenues increased $908,325 or 4.99%, increases in most classes of ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... for GRPUC. In 2021 a new agreement was negotiated and signed with Minnesota Power. That contract went ...

  5. Data Request

    Police | Page

    stat. Sec. 13.03, Subd. 2 and 13.05, Subd. 5 and 8. The Minnesota Data Practices Act establishes ... on xx/xx/03 City of Grand Rapids Data Access Procedures Introduction These procedures are adopted to ... problems in obtaining access to data may be directed. 2 Approved by the City Council on xx/xx/03 Categories ...

  6. 2023 Load Management Electric Service Rate Schedule

    Public Utilities | Page

    12/18/2019 Effective 05/01/2021 June-September @ customer's normal electric customer charge ... Monthly Credit o�3 Ton Air G:onditi0ning Unit Monthly G:redit 4-6 Ton Air €onditio.ning Unit ... $ $ $ $ $ $ '$ $ 2023 LOAD MANAGEMENT ELECTRIC SERVICE RATE SCHEDULE customer Charge (per month) (5.00) (2.50) ...

  7. 2023 City Electric Interim Annexation Areas Service Rate Schedule

    Public Utilities | Page

    Effective 05/01/2021 ... RATE SCHEDULE Customer Charge (per month) RESIDENTIAL $ 10.40 COMMERCIAL $ 19.55 Adopted: ... (PPA) CLAUSE There shall be added to from the monthly electric service billing, a Purchased Power ...

  8. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28.00 ... shall be added to from the monthly electric service billing, a Purchased Power Adjustment or PPA ...

  9. 2023 City Electric Service Rate Schedule

    Public Utilities | Page

    Adopted 12/18/2019 Effective 05/01/2021 ... LIGHTING INDUSTRIAL $ $ $ $ $ Customer Charge (per month) 10.40 19.55 28.00 12.75 12.50 Adopted: ... PURCHASED POWER ADJUSTMENT (PPA) CLAUSE There shall be added to from the monthly electric service billing, ...

  10. 2023 Electric Vehicle Service Rate Schedule

    Public Utilities | Page

    Effective 05/01/2021 I\...l--"--...l-i ""l /-i O /"'11"\-i I"\ ... After: Customer Energy Charge Charge (per month) 4.15 26.25 existing or standalone charqe existing or All ... (PPA) CLAUSE There shall be added to from the monthly electric service billing, a Purchased Power ...

Pages