  1. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28.00 ... 05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... 2023 Electric Rural Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact Info Block ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ... iron distribution mains consisting mostly of 6”, 8” and 12” pipe. The GRPUC is responsible for the ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    19,505 20,090 Seminar/training 41,493 12,554 12,617 11,590 11,401 12,000 12,600 12,978 13,367 13,768 ... GRPUC is billed monthly by MP based on the overall system peak. A 12 CP method, reflecting each class’ ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ...

  4. 2023 Electric Security Light Rates

    Public Utilities | Page

    Z 2023_electric_security_light_rate_schedule.pdf Rate per Lamp Per Month GRAND RAPIDS PUBLIC UTILITIES COMMISSION Adopted 12 ... Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... 2023 Electric Security Light Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact ...

  5. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... ,98440,984Forest Lake/YMCA Outdoor Rink 3 CIP Fund 40,984 40,984 2023/P&R-1 20,00020,000Blandin Beach House Demo 2 CIP ... Blandin Beach House Demo 20 Blandin Beach Restrooms 21 Blandin Beach Pavilion 22 New Fire Hall/Police Evidence 23 Building ...

  6. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... Funds Statement 3 40 Statement of Revenues, Expenditures and Changes in Fund Balance- Governmental Funds ... General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ...

  7. Distributed Energy Resources

    Public Utilities | Page

    Simplified Process (under 20kW capacity)  c. Fast Track Process (see applicability within)  d. Study Process (see applicability within)  2. ... a. Uniform Contract (under 40kW capacity)  b. ... Municipal Minnesota Interconnection Agreement (over 40kW or upon customer request)  c. Certificate of Completion      Detroit Lakes Public Utility’s 29.3 kW Select Solar  ...

  8. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    a new permit requirement. Compliance with new requirements is required within 12 months after receiving ... requirements is required within 12 months after receiving permit coverage.) • 651-296-6300 • 800-657-3864 • Use ... 12 months after receiving permit coverage.) (Note: All or some of this item is a new permit ...

  9. 2023 Load Management Electric Service Rate Schedule

    Public Utilities | Page

    8.40 8.40 8.40 (9.83) (9.83) (19.73) Adopted: Effective: Billed After: Energy Charge Monthly Credit ... Monthly Credit 12/14/2022 01/01/2023 01/01/2023 All kWh/mo @ $0.0699/kWh Minimum bill- Customer Charge All ... 2023 Electric Load Management Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact ...

  10. Solar Energy Rebate Program

    Public Utilities | Page

    RAPIDS PUBLIC UTILITIES COMMISSION SOLAR ELECTRIC REBATE PROGRAM.5 kW – 40 kW The Grand Rapids Public ... twelve months energy consumption. Installation Requirements: 1. Receive GRPUC approval prior to ... earlier of three months of receiving approval of the interconnection agreement or before the end of the ...