Page not found
Search results
-
Public Utilities Financial Reports
Public Utilities | Page2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Collection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ...
-
Utility Information
Engineering / Public Works | Page. Commercial $48.98 per acre per month. Industrial $48.98 per acre per month. Institutional $43.44 per acre per month ... able to retain the 10-year, 24-hour type II SCS storm event. To qualify for this credit, the property ... year is as follows: 2023: Single Family $8.75 per month. Multi-Family $31.98 per acre per month ...
-
2022 Cost of Service Studies
Public Utilities | Page$3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 9,450 9,734 10,026 10,326 10,636 Locating Expense 48,000 50,400 51,912 53,469 55,073 56,726 Meters ... the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ...
-
Financial Reports
Finance | PageFunds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ... Changes in Fund Balance- Nonmajor Debt Service Funds Statement 24 132 Subcombining Balance Sheet- Nonmajor ... Table 10 178 Ratios of General Bonded Debt Outstanding Table 11 179 Direct and Overlapping Governmental ...
-
Basic Wood Framing
Community Development | PageLaterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24c 16c ... — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... 19.2” O.C. 8-9 11-6 14-1 16-3 24” O.C. 8-1 10-3 12-7 14-7 GIRDER SPANS AND HEADER SPANS FOR EXTERIOR ...
-
Data Request
Police | Page$44.78 $47.58 $48.98 Institutional $39.72 $42.20 $43.44 City Map $10.00 Prints: 24/24 $3.50 each 24 ... $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ... Single-Family $8.00 $8.50 $8.75 Multi-Family $29.24 $31.07 $31.98 Commercial $44.78 $47.58 $48.98 Industrial ...
-
Footings, Foundations & Slabs
Community Development | Page@ 48” #5 @ 48” #6 @ 48” #6 @ 40” #6 @ 24” #4 @ 56” #4 @ 56” #5 @ 56” #6 @ 56” #6 @ 32” #4 @ 72” #4 @ 72” ... #6 @ 72” #6 @ 48” #4 @ 48” #5 @ 48” #6 @ 48” #6 @ 40” #6 @ 24” #6 @ 16” #4 @ 56” #4 @ 56” #5 @ 56” #6 ... @ 56” #6 @ 40” #6 @ 24” #4 @ 72” #4 @ 72” #5 @ 72” #6 @ 72” #6 @ 56” #6 @ 40” 10 feet 4 feet (or less) ...
-
Islamic Practices & Muslim Community Guide
Human Rights Commission | PageIslamic holy days and festivals follow the lunar calendar. Like the solar calendar, it has twelve months ... ninth month of the Islamic lunar calendar, is the time when Muslims are required to fast. Fasting during ... month of Ramadan, the ninth month of the Islamic lunar calendar, is the period in which Muslims are ...
-
City Council
City Council | PageCouncil City Council With Photos 2nd and 4th Monday of each month 5 including Mayor Mayor- 24 months ... / Councilor- 48 months ...
-
Garages: One Story
Community Development | Page’6” 12’10” SPF 5’8” 8’5” 10’8” 13’1” 24” o.c. Hem Fir 4’8” 6’9” 8’7” 10’6” SPF 4’8” 6’11” 8’9” 10 ... finished grade. WALL CONSTRUCTION Walls may be framed with minimum No. 3 grade studs spaced 16 or 24 inches ... than 5/16 inch for 16-inch stud spacing and not less than 3/8 inch for 24-inch stud spacing. Sheathing ...