Page not found

Search results

  1. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    formats https://www.pca.state.mn.us wq-strm4-49a • 9/ /20 Page 1 of 32 MS4 Part 2 Permit Application ... wq-strm4-49a • 9/ /20 Page 2 of 32 I certify under penalty of law that this document and all attachments were ... wq-strm4-49a • 9/ /20 Page 3 of 32 MCM 1: Public education and outreach (Note: All or some of this item is ...

  2. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28.00 ... 05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... shall be added to from the monthly electric service billing, a Purchased Power Adjustment or PPA ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Collection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... 2027 Operating Revenues $19,061,765 $18,448,198 $18,977,138 $19,515,558 $20,064,303 $20,624,106 Less ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ...

  5. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... Notes to Financial Statements 49 Required Supplementary Information: Budgetary Comparison Schedule- ... Expenditures and Changes in Fund Balance- Nonmajor Governmental Funds Statement 20 119 Subcombining Balance ...

  6. Grand Rapids Monitoring Results

    Public Utilities | Page

    concentration between 0.5 to 0.9 parts per million (ppm) to protect your teeth. Fluoride levels below 2.0 ppm ... This report contains our monitoring results from January 1 to December 31, 2020. We work with the ... times where the Range of Detected Test Results for the calendar year is lower than the Highest Average ...

  7. Grand Rapids Pavement Art RFQ

    Arts & Culture Commission | Bid/RFP

    and Culture Commission. Schedule  February 14, 2020 – RFQ announced  March 20, 2020 – Deadline for ... tpagel@ci.grand-rapids.mn.us. All materials must be received by 4 p.m., CST, Friday, March 20, 2020. No RFQs will be accepted ... 2020 Grand Rapids Pavement Art RFQ Image Slideshow Closed- no longer accepting bids and proposals ...

  8. Data Request

    Police | Page

    BUILDING Monthly Rental Fees Garden Level $11.02 * 1st Floor $11.97 * 2nd Floor $11.49 * 3rd Floor $ 8.58 ... Charges Imposed on Requests Exceeding Cost of $20.00 Hourly Rate (charged by 1/4 hour) $20.00 911 Call ...   * Not subject to the $20.00 excess rule. $1.00 1st Page- $0.10 each additional page   Data Request Form ...

  9. Utility Information

    Engineering / Public Works | Page

    year is as follows: 2023: Single Family $8.75 per month. Multi-Family $31.98 per acre per month ... . Commercial $48.98 per acre per month. Industrial $48.98 per acre per month. Institutional $43.44 per acre per month ... Practices Credit Policy (As per Section 70-203(b) of Ordinance No. 17-05-03) Background On May 8, 2017, the ...

  10. Stormwater Credits Policy

    Engineering / Public Works | Page

    Ordinance No. 17-05-03) Background On May 8, 2017, the Grand Rapids City Council approved a Stormwater ... Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... a determination of the credit once per calendar year. If the credit is approved, the credit will be applied within ...

Pages