Page not found

Search results

  1. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28.00 ... 05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... shall be added to from the monthly electric service billing, a Purchased Power Adjustment or PPA ...

  2. Grand Rapids Monitoring Results

    Public Utilities | Page

    This report contains our monitoring results from January 1 to December 31, 2020. We work with the ... times where the Range of Detected Test Results for the calendar year is lower than the Highest Average ... or Highest Single Test Result because it occurred in the previous calendar year. Definitions AL ...

  3. Data Request

    Police | Page

    stat. Sec. 13.03, Subd. 2 and 13.05, Subd. 5 and 8. The Minnesota Data Practices Act establishes ... on xx/xx/03 City of Grand Rapids Data Access Procedures Introduction These procedures are adopted to ... problems in obtaining access to data may be directed. 2 Approved by the City Council on xx/xx/03 Categories ...

  4. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ... aeration, gravity filtration, and zeolite softening. Treated water is stored in a 0.5 million gallon ...

  5. 2023 Load Management Electric Service Rate Schedule

    Public Utilities | Page

    8.40 8.40 8.40 (9.83) (9.83) (19.73) Adopted: Effective: Billed After: Energy Charge Monthly Credit ... Monthly Credit o�3 Ton Air G:onditi0ning Unit Monthly G:redit 4-6 Ton Air €onditio.ning Unit ... $ $ $ $ $ $ '$ $ 2023 LOAD MANAGEMENT ELECTRIC SERVICE RATE SCHEDULE customer Charge (per month) (5.00) (2.50) ...

  6. Utility Information

    Engineering / Public Works | Page

    Practices Credit Policy (As per Section 70-203(b) of Ordinance No. 17-05-03) Background On May 8, 2017, the ... Grand Rapids City Council approved a Stormwater Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, ... year is as follows: 2023: Single Family $8.75 per month. Multi-Family $31.98 per acre per month ...

  7. Stormwater Credits Policy

    Engineering / Public Works | Page

    Ordinance No. 17-05-03) Background On May 8, 2017, the Grand Rapids City Council approved a Stormwater ... Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... a determination of the credit once per calendar year. If the credit is approved, the credit will be applied within ...

  8. Community Development Fee Schedule

    Community Development | Page

    Door (12-17-12) $40.00 $1.00 $41.00 Siding Replacement (3-27-06) $60.00 $1.00 $61.00 All Regulated ... high (non enclosed) Attached Steps/Deck (non enclosed) Covered porch (non enclosed) (2-9-15) $40 ... .30 $79.70 $113.03 $26.20 $51.80 $73.47 $1.00 $1.00 $1.00 $67.50 $132.50 $186.50 Fence over 6 feet in height ...

  9. 2023 City Electric Interim Annexation Areas Service Rate Schedule

    Public Utilities | Page

    RATE SCHEDULE Customer Charge (per month) RESIDENTIAL $ 10.40 COMMERCIAL $ 19.55 Adopted: ... (PPA) CLAUSE There shall be added to from the monthly electric service billing, a Purchased Power ... Effective 05/01/2021 ...

  10. 2022 Cost of Service Studies

    Public Utilities | Page

    the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... projected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ...

Pages