Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    Investment income (loss) (86,061) 20,730 30,745 (106,791) (10,015) Demand interest payments 470,362 445,886 ... Collection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ...

  2. 2022 Cost of Service Studies

    Public Utilities | Page

    9,450 9,734 10,026 10,326 10,636 Locating Expense 48,000 50,400 51,912 53,469 55,073 56,726 Meters ... the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... 2027 Operating Revenues $19,061,765 $18,448,198 $18,977,138 $19,515,558 $20,064,303 $20,624,106 Less ...

  3. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Simplified Process (under 20kW capacity)  c. Fast Track Process (see applicability within)  d. Study Process (see applicability within)  2. ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...

  4. Data Request

    Police | Page

    $44.78 $47.58 $48.98 Institutional $39.72 $42.20 $43.44 City Map $10.00 Prints: 24/24 $3.50 each 24/36 ... $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ...   * Not subject to the $20.00 excess rule. $1.00 1st Page- $0.10 each additional page   Data Request Form ...

  5. Financial Reports

    Finance | Page

    evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... 2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ...

  6. Utility Information

    Engineering / Public Works | Page

    . Commercial $48.98 per acre per month. Industrial $48.98 per acre per month. Institutional $43.44 per acre per month ... year is as follows: 2023: Single Family $8.75 per month. Multi-Family $31.98 per acre per month ... section 1.0 through 1.6) to finance the City’s Stormwater Management Program. In addition, the Utility ...

  7. Islamic Practices & Muslim Community Guide

    Human Rights Commission | Page

    Islamic holy days and festivals follow the lunar calendar. Like the solar calendar, it has twelve months ... ninth month of the Islamic lunar calendar, is the time when Muslims are required to fast. Fasting during ... month of Ramadan, the ninth month of the Islamic lunar calendar, is the period in which Muslims are ...

  8. Basic Wood Framing

    Community Development | Page

    — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... 9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ... 2 5-2 2 4-8 2 3-2×10 7-3 2 6-4 2 5-8 2 3-2×12 8-5 2 7-4 2 6-7 2 4-2×8 6-10 1 6-0 2 5-5 2 4-2×10 8-4 ...

  9. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    Charges Charges calculated are per month Meter Size 5/8"-3/4" 1" 1 ¼" 1 ½" ... 2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 $20.00 $25.00 $35.00 $50.00 Commodity ... Charges Charges calculated are per 1000 gallons per month Residential All Gallons Commercial/Industrial ...

  10. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... 150 over 150 6 $5.71 $3.99 $38.25 0 24 25 48 49 180 over 180 7 $5.71 $3.99 $43.96 0 28 29 56 57 210 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ...

Pages