Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    Investment income (loss) (86,061) 20,730 30,745 (106,791) (10,015) Demand interest payments 470,362 445,886 ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  2. 2022 Cost of Service Studies

    Public Utilities | Page

    the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... 2027 Operating Revenues $19,061,765 $18,448,198 $18,977,138 $19,515,558 $20,064,303 $20,624,106 Less ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ...

  3. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Simplified Process (under 20kW capacity)  c. Fast Track Process (see applicability within)  d. Study Process (see applicability within)  2. ... Municipal Minnesota Interconnection Agreement (over 40kW or upon customer request)  c. Certificate of Completion      Detroit Lakes Public Utility’s 29 ...

  4. Islamic Practices & Muslim Community Guide

    Human Rights Commission | Page

    Islamic holy days and festivals follow the lunar calendar. Like the solar calendar, it has twelve months ... . However, a lunar month, which is marked by the appear- ance of a new crescent moon, may last only 29 days. ... ninth month of the Islamic lunar calendar, is the time when Muslims are required to fast. Fasting during ...

  5. Financial Reports

    Finance | Page

    evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... 2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ...

  6. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ... 14 15 16 16 17 18 19 20 21 22 13 14 15 16 17 18 19 17 18 19 20 21 22 23 23 24 25 26 27 28 29 20 21 22 ...

  7. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    10 1415511 NORTHERN STAR COOPERATIVE SERV 432. 29 1621130 P. U. C. 386. 62 2209665 VISA 137. 59 TOTAL ... Changes in Revenue, Expenditures, and Fund Balance FOR THE THREE MONTHS ENDING MARCH 31, 2019 FUND BALANCE ... Meeting with Agenda and Minutes Thursday, March 28, 2019- 4:00pm Agenda Image Slideshow Display ...

  8. Utility Information

    Engineering / Public Works | Page

    year is as follows: 2023: Single Family $8.75 per month. Multi-Family $31.98 per acre per month ... . Commercial $48.98 per acre per month. Industrial $48.98 per acre per month. Institutional $43.44 per acre per month ... section 1.0 through 1.6) to finance the City’s Stormwater Management Program. In addition, the Utility ...

  9. Stormwater Credits Policy

    Engineering / Public Works | Page

    Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... a determination of the credit once per calendar year. If the credit is approved, the credit will be applied within ... Credits program offers businesses a credit of up to 50% of monthly stormwater utility charges. Business ...

  10. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    • Available in alternative formats https://www.pca.state.mn.us wq-strm4-49a • 9/ /20 Page 29 of 32 (Note: All ... formats https://www.pca.state.mn.us wq-strm4-49a • 9/ /20 Page 1 of 32 MS4 Part 2 Permit Application ... wq-strm4-49a • 9/ /20 Page 2 of 32 I certify under penalty of law that this document and all attachments were ...

Pages