  1. Public Utilities Financial Reports

    Public Utilities | Page

    Supplementary Information (cont.) Wastewater Treatment Plant Primary Plant II – Schedule of Expenses 52 Screen ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  2. 2022 Cost of Service Studies

    Public Utilities | Page

    the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... 2027 Operating Revenues $19,061,765 $18,448,198 $18,977,138 $19,515,558 $20,064,303 $20,624,106 Less ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ...

  3. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ... ‐Application Report Requests ..................................................................................... 9  ii    5.2.  Information ...

  4. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    Changes in Revenue, Expenditures, and Fund Balance FOR THE THREE MONTHS ENDING MARCH 31, 2019 FUND BALANCE ... amaFi. ed 10 y 1 3/27/2015 MRM Management (MeAdly) GRD 32,698:67 19 Nov 13 19841 1 Bas 18 27; 02150 2nd ... LLC CBD Interior and exterior 35, 000.00 13-Jul-18 306,52 1- Jul-29 IWA 2nd Mortgage[Note SCDP Speciat ...

  5. Financial Reports

    Finance | Page

    evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... longer be produced or imported as of 2019. In addition, the 52-year old piping in the floor contains slow ... Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ...

  6. 2023 City Electric Interim Annexation Areas Service Rate Schedule

    Public Utilities | Page

    RATE SCHEDULE Customer Charge (per month) RESIDENTIAL $ 10.40 COMMERCIAL $ 19.55 Adopted: ... 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ... (PPA) CLAUSE There shall be added to from the monthly electric service billing, a Purchased Power ...

  7. 2023 City Electric Service Rate Schedule

    Public Utilities | Page

    LIGHTING INDUSTRIAL $ $ $ $ $ Customer Charge (per month) 10.40 19.55 28.00 12.75 12.50 Adopted: ... Adopted 12/18/2019 Effective 05/01/2021 ... PURCHASED POWER ADJUSTMENT (PPA) CLAUSE There shall be added to from the monthly electric service billing, ...

  8. 2023 Electric Vehicle Service Rate Schedule

    Public Utilities | Page

    12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ... After: Customer Energy Charge Charge (per month) 4.15 26.25 existing or standalone charqe existing or All ... Charge Customer Charge On Peak Hours: 8:00 a.m. to 10:00 p.m. Monday- Friday PURCHASED POWER ADJUSTMENT ...

  9. Basic Wood Framing

    Community Development | Page

    2 2-2×10 6-6 2 5-7 2 5-0 2 2-2×12 7-6 2 6-6 2 5-10 3 3-2×8 6-8 1 5-9 2 5-2 2 3-2×10 8-2 2 7-0 2 6-4 ... 2 5-2 2 4-8 2 3-2×10 7-3 2 6-4 2 5-8 2 3-2×12 8-5 2 7-4 2 6-7 2 4-2×8 6-10 1 6-0 2 5-5 2 4-2×10 8-4 ... 1 1-8 1 1-5 2 2-2×6 2-11 2 2-7 2 2-3 2 2-2×8 3-9 2 3-3 2 2-11 3 2-2×10 4-7 3 4-0 3 3-6 3 2-2×12 5-4 ...

  10. 2023 Electric Security Light Rates

    Public Utilities | Page

    Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... Z 2023_electric_security_light_rate_schedule.pdf Rate per Lamp Per Month GRAND RAPIDS PUBLIC UTILITIES COMMISSION Adopted 12/14/2022 ... Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ...

Pages