  1. Public Utilities Financial Reports

    Public Utilities | Page

    prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ...

  2. 2022 Cost of Service Studies

    Public Utilities | Page

    29,400 30,282 31,190 32,126 33,090 Safety 21,887 18,731 12,098 29,396 30,613 17,000 17,850 18,386 18 ... the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... 2027 Operating Revenues $19,061,765 $18,448,198 $18,977,138 $19,515,558 $20,064,303 $20,624,106 Less ...

  3. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...  .......................................................................................................................... 3  3.2.  Importance ...

  4. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    10 of 32 (Note: All or some of this item is a new permit requirement. Compliance with new ... wq-strm4-49a • 9/ /20 Page 18 of 32 (Note: All or some of this item is a new permit requirement. Compliance ... formats https://www.pca.state.mn.us wq-strm4-49a • 9/ /20 Page 1 of 32 MS4 Part 2 Permit Application ...

  5. Basic Wood Framing

    Community Development | Page

    (2) 7-0 (2) 6-7 (2) 3-2X8 7-2 (1) 6-9 (1) 6-3 (1) 5-11 (2) 3-2X10 8-9 (1) 8-2 (1) 7-7 (2) 7-2 (2) ... 3-2X12 10-2 (2) 9-6 (2) 8-10 (2) 8-3 (2) 4-2X8 9-0 (1) 8-3 (1) 7-8 (1) 7-3 (1) 4-2X10 10-1 (1) 9-5 (1) ... 1-9 (1) 2-2X6 3-2 (2) 3-0 (2) 2-9 (2) 2-7 (2) 2-2X8 4-1 (2) 3-10 (2) 3-6 (2) 3-4 (2) 2-2X10 4-11 (2) ...

  6. 2023 City Electric Interim Annexation Areas Service Rate Schedule

    Public Utilities | Page

    RATE SCHEDULE Customer Charge (per month) RESIDENTIAL $ 10.40 COMMERCIAL $ 19.55 Adopted: ... 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ... (PPA) CLAUSE There shall be added to from the monthly electric service billing, a Purchased Power ...

  7. Financial Reports

    Finance | Page

    evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ... Statement 18 110 Notes to Required Supplementary Information 111 CITY OF GRAND RAPIDS, MINNESOTA TABLE OF ...

  8. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    amaFi. ed 10 y 1 3/27/2015 MRM Management (MeAdly) GRD 32,698:67 19 Nov 13 19841 1 Bas 18 27; 02150 2nd ... Changes in Revenue, Expenditures, and Fund Balance FOR THE THREE MONTHS ENDING MARCH 31, 2019 FUND BALANCE ... Meeting with Agenda and Minutes Thursday, March 28, 2019- 4:00pm Agenda Image Slideshow Display ...

  9. Decks

    Community Development | Page

    22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... 9 27 13 47 17 72 21 16 10 32 14 53 18 79 22 19 11 36 15 59 19 86 23 JOIST SPANS (Wet Service) (Source ... SPACING OF FASTENERS4,5 ½” DIAM. LAG SCREW WITH 15/32” SHEATHING1 30 23 18 15 13 11 10 ½” DIAM. BOLT WITH ...

  10. 2023 City Electric Service Rate Schedule

    Public Utilities | Page

    LIGHTING INDUSTRIAL $ $ $ $ $ Customer Charge (per month) 10.40 19.55 28.00 12.75 12.50 Adopted: ... Adopted 12/18/2019 Effective 05/01/2021 ... PURCHASED POWER ADJUSTMENT (PPA) CLAUSE There shall be added to from the monthly electric service billing, ...