  1. Public Utilities Financial Reports

    Public Utilities | Page

    prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ...

  2. 2022 Cost of Service Studies

    Public Utilities | Page

    the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... 2027 Operating Revenues $19,061,765 $18,448,198 $18,977,138 $19,515,558 $20,064,303 $20,624,106 Less ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ...

  3. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ... ‐Application Report Components ............................................................................. 10  6  Capacity ...

  4. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    amaFi. ed 10 y 1 3/27/2015 MRM Management (MeAdly) GRD 32,698:67 19 Nov 13 19841 1 Bas 18 27; 02150 2nd ... Changes in Revenue, Expenditures, and Fund Balance FOR THE THREE MONTHS ENDING MARCH 31, 2019 FUND BALANCE ... ACTUAL-' ANNUAL TO 3/ 31/ 18 700 3/ 31/ 19 BUDGET Fund Balance 1/ 1/ XX: $ 28,558 27;609 27,609 REVENUES: ...

  5. 2023 City Electric Interim Annexation Areas Service Rate Schedule

    Public Utilities | Page

    RATE SCHEDULE Customer Charge (per month) RESIDENTIAL $ 10.40 COMMERCIAL $ 19.55 Adopted: ... 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ... (PPA) CLAUSE There shall be added to from the monthly electric service billing, a Purchased Power ...

  6. Financial Reports

    Finance | Page

    evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ... Statement 18 110 Notes to Required Supplementary Information 111 CITY OF GRAND RAPIDS, MINNESOTA TABLE OF ...

  7. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 14 15 16 16 17 18 19 20 21 22 13 14 15 16 17 18 19 17 18 19 20 21 22 23 23 24 25 26 27 28 29 20 21 22 ... F S 1 2 3 4 1 2 1 2 3 4 5 6 7 5 6 7 8 9 10 11 3 4 5 6 7 8 9 8 9 10 11 12 13 14 12 13 14 15 16 17 18 10 11 12 13 14 15 16 15 16 17 18 19 20 21 ...

  8. 2023 City Electric Service Rate Schedule

    Public Utilities | Page

    LIGHTING INDUSTRIAL $ $ $ $ $ Customer Charge (per month) 10.40 19.55 28.00 12.75 12.50 Adopted: ... Adopted 12/18/2019 Effective 05/01/2021 ... PURCHASED POWER ADJUSTMENT (PPA) CLAUSE There shall be added to from the monthly electric service billing, ...

  9. 2023 Electric Vehicle Service Rate Schedule

    Public Utilities | Page

    12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ... After: Customer Energy Charge Charge (per month) 4.15 26.25 existing or standalone charqe existing or All ... Charge Customer Charge On Peak Hours: 8:00 a.m. to 10:00 p.m. Monday- Friday PURCHASED POWER ADJUSTMENT ...

  10. Islamic Practices & Muslim Community Guide

    Human Rights Commission | Page

    Ascension): This event is marked on the 27th day of Rajab, the seventh month in the Islamic calendar. The ... Islamic holy days and festivals follow the lunar calendar. Like the solar calendar, it has twelve months ... ninth month of the Islamic lunar calendar, is the time when Muslims are required to fast. Fasting during ...

Pages