  1. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28.00 ... 05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... shall be added to from the monthly electric service billing, a Purchased Power Adjustment or PPA ...

  2. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    Charges Charges calculated are per month Meter Size 5/8"-3/4" 1" 1 ¼" 1 ½" ... 2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 $20.00 $25.00 $35.00 $50.00 Commodity ... Charges Charges calculated are per 1000 gallons per month Residential All Gallons Commercial/Industrial ...

  3. 2023 Load Management Electric Service Rate Schedule

    Public Utilities | Page

    12/18/2019 Effective 05/01/2021 June-September @ customer's normal electric customer charge ... Monthly Credit o�3 Ton Air G:onditi0ning Unit Monthly G:redit 4-6 Ton Air €onditio.ning Unit ... $ $ $ $ $ $ '$ $ 2023 LOAD MANAGEMENT ELECTRIC SERVICE RATE SCHEDULE customer Charge (per month) (5.00) (2.50) ...

  4. Public Utilities Financial Reports

    Public Utilities | Page

    December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ... aeration, gravity filtration, and zeolite softening. Treated water is stored in a 0.5 million gallon ... system includes three 0.5 million gallons elevated storage reservoirs and 81 miles of cast and ductile ...

  5. 2023 City Electric Interim Annexation Areas Service Rate Schedule

    Public Utilities | Page

    RATE SCHEDULE Customer Charge (per month) RESIDENTIAL $ 10.40 COMMERCIAL $ 19.55 Adopted: ... (PPA) CLAUSE There shall be added to from the monthly electric service billing, a Purchased Power ... 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ...

  6. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Simplified Process (under 20kW capacity)  c. Fast Track Process (see applicability within)  d. Study Process (see applicability within)  2. ... DER Technology  Size Limitations  Simplified Process  Certified Inverter only  20 kW AC  Fast Track Process  ...

  7. Utility Information

    Engineering / Public Works | Page

    year is as follows: 2023: Single Family $8.75 per month. Multi-Family $31.98 per acre per month ... . Commercial $48.98 per acre per month. Industrial $48.98 per acre per month. Institutional $43.44 per acre per month ... Practices Credit Policy (As per Section 70-203(b) of Ordinance No. 17-05-03) Background On May 8, 2017, the ...

  8. 2023 City Electric Service Rate Schedule

    Public Utilities | Page

    Adopted 12/18/2019 Effective 05/01/2021 ... LIGHTING INDUSTRIAL $ $ $ $ $ Customer Charge (per month) 10.40 19.55 28.00 12.75 12.50 Adopted: ... PURCHASED POWER ADJUSTMENT (PPA) CLAUSE There shall be added to from the monthly electric service billing, ...

  9. 2023 Electric Vehicle Service Rate Schedule

    Public Utilities | Page

    After: Customer Energy Charge Charge (per month) 4.15 26.25 existing or standalone charqe existing or All ... (PPA) CLAUSE There shall be added to from the monthly electric service billing, a Purchased Power ... 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ...

  10. Stormwater Credits Policy

    Engineering / Public Works | Page

    Ordinance No. 17-05-03) Background On May 8, 2017, the Grand Rapids City Council approved a Stormwater ... Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... a determination of the credit once per calendar year. If the credit is approved, the credit will be applied within ...