  1. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28.00 ... All kWh/mo@ $0.1111/kWh All kWh/mo @ $0.0557/kWh Demand: All kW@ $17.64/kW 12/14/2022 01/01/2023 ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    House – Schedule of Expenses 53 Sludge Disposal – Schedule of Expenses 54 Secondary Treatment Facility ... Auditors' Report on Legal Compliance 88 INTRODUCTORY SECTION i May 17, 2023 Members of the Commission Grand ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ...

  3. 2023 City Electric Service Rate Schedule

    Public Utilities | Page

    Adopted 12/18/2019 Effective 05/01/2021 ... LIGHTING INDUSTRIAL $ $ $ $ $ Customer Charge (per month) 10.40 19.55 28.00 12.75 12.50 Adopted: ... $0.1072/kWh All kWh/mo @ $0.0520/kWh Demand: All kW@ $17.64/kW All kWh@ $0.1032/kWh All kWh@ $0.1043/kWh In ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ...

  5. Utility Information

    Engineering / Public Works | Page

    Practices Credit Policy (As per Section 70-203(b) of Ordinance No. 17-05-03) Background On May 8, 2017, the ... Grand Rapids City Council approved a Stormwater Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, ... year is as follows: 2023: Single Family $8.75 per month. Multi-Family $31.98 per acre per month ...

  6. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    Charges Charges calculated are per month Meter Size 5/8"-3/4" 1" 1 ¼" 1 ½" ... 2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 $20.00 $25.00 $35.00 $50.00 Commodity ... Charges Charges calculated are per 1000 gallons per month Residential All Gallons Commercial/Industrial ...

  7. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  Provided ....................................................................................................... 9  5.3.  Pre ... ‐Warranty ............................................................................................................. 17  12.3.  Indemnification ...

  8. Stormwater Credits Policy

    Engineering / Public Works | Page

    Ordinance No. 17-05-03) Background On May 8, 2017, the Grand Rapids City Council approved a Stormwater ... Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... a determination of the credit once per calendar year. If the credit is approved, the credit will be applied within ...

  9. 2023 Load Management Electric Service Rate Schedule

    Public Utilities | Page

    12/18/2019 Effective 05/01/2021 June-September @ customer's normal electric customer charge ... Monthly Credit o�3 Ton Air G:onditi0ning Unit Monthly G:redit 4-6 Ton Air €onditio.ning Unit ... $ $ $ $ $ $ '$ $ 2023 LOAD MANAGEMENT ELECTRIC SERVICE RATE SCHEDULE customer Charge (per month) (5.00) (2.50) ...

  10. 2023 City Electric Interim Annexation Areas Service Rate Schedule

    Public Utilities | Page

    RATE SCHEDULE Customer Charge (per month) RESIDENTIAL $ 10.40 COMMERCIAL $ 19.55 Adopted: ... (PPA) CLAUSE There shall be added to from the monthly electric service billing, a Purchased Power ... 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ...